Pre-construction technical disclosure method based on BIM

A construction scheme and technology, applied in special data processing applications, instruments, electrical and digital data processing, etc., can solve problems such as rework, technical disclosure of construction personnel, and inability to fully understand the content of construction disclosure, so as to improve construction efficiency and ensure construction. quality effect

Inactive Publication Date: 2015-04-29
CHINA MCC17 GRP
View PDF3 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing application number 201410362565.4, the patented technology of the invention name "a drawing joint review system and method based on BIM technology", only reviews the construction drawings of the BIM 3D model, and does not provide technical disclosure to the construction personnel, which will lead to the construction personnel's The content of the construction disclosure cannot be fully understood, and mistakes often occur during the construction process, resulting in rework, which has a negative impact on project quality, progress, and cost control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-construction technical disclosure method based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The present invention will be further described below in conjunction with the drawings.

[0017] In the figure, a BIM-based pre-construction technical confession method of the present invention includes the following steps:

[0018] Step 1: Establish a construction BIM three-dimensional model according to the construction drawing or construction plan, and mark the relevant technical parameters in the model; the construction drawing is the construction drawing of steel reinforcement engineering, masonry engineering and stucco engineering, and the construction plan is scaffolding engineering, template erection and support Project construction plan;

[0019] Step 2: Make the decomposed schematic diagram of the construction BIM 3D model in the horizontal, vertical and cross-section and the construction flow chart as the written card of the construction plan;

[0020] Step 3: Place the construction BIM 3D model on the communication screen through visualization equipment;

[0021] Ste...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pre-construction technical disclosure method based on BIM. The method includes the following steps: building a construction BIM three-dimensional model according to construction design and marking relevant technical parameters in the model; manufacturing a construction scheme disclosure written card; placing the construction BIM three-dimensional model on a communication screen through a visual device. The method further includes that a designer breaks down the BIM three-dimensional model through the communication screen and explain technical parameters to constructors to conduct technical disclosure, and the constructors feed back opinions through the technical disclosure. The method has the advantages of being visual, quick and capable of improving construction efficiency, enabling the constructors to learn construction steps and various construction requirements and ensuring construction quality.

Description

Technical field [0001] The present invention relates to a construction method for building informatization, and more specifically, to a BIM-based pre-construction technical disclosure method. Background technique [0002] In the construction process of the project, before each process starts construction, the construction team members need to be technically confessed. The current method of technical confession is to first compile the construction technical confession form, and then make an oral confession to the construction team members, and finally in writing Sign confirmation on the confession record. The existing application number 201410362565.4, the patented technology of the invention title "A system and method for drawing review based on BIM technology", only reviews the construction drawings of the BIM three-dimensional model, and does not provide technical disclosure to the construction personnel, which will cause the construction personnel to The content of the constr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06Q50/08
Inventor 卜华琳
Owner CHINA MCC17 GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products