Seamless telescopic device between main girder and abutment with built-in corrugated steel plate and its construction method

A corrugated steel plate, seamless expansion and contraction technology, applied in the direction of bridges, bridge parts, bridge construction, etc., can solve the problems of application limitations, less structural forms, etc., and achieve the effect of simple structure, easy processing and easy installation

CN104594191BInactive Publication Date: 2016-05-25XIAN HIGHWAY INST
7 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Publication Date
2016-05-25
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a corrugated steel plate built-in seamless expansion device between a girder and a bridge abutment and a construction method of the seamless expansion device. The expansion device comprises prefabricated steel plate elements distributed on a bridge abutment expansion joint and expansion joint filler packing layer filled above the prefabricated steel plate elements; the prefabricated steel plate elements comprise straight steel plates, corrugated steel plates and a plurality of arched reinforcing steel bars; a plurality of shear pins are fixed on the corrugated steel plates; a sliding layer is paved on the girder exposed section; the construction method of the to-be-repaired expansion device comprises the following steps: cleaning the original bridge expansion device, constructing preserved mounting grooves, constructing the girder sliding layer, assembling the prefabricated steel plate elements in the field, and mounting and constructing the expansion joint filler packing layer; the construction method of the to-be-constructed expansion device comprises the following steps: prefabricating and processing the prefabricated steel plate elements, assembling the prefabricated steel plate elements in the field, constructing the girder sliding layer, mounting the prefabricated steel plate elements, and constructing the bridge deck pavement structure and the expansion joint filler packing layer. The corrugated steel plate built-in seamless expansion device disclosed by the invention is reasonable in design, convenient to construct, and good in use effect, and can solve a plurality of problems in the existing expansion device.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of bridge expansion joint construction, and in particular relates to a seamless expansion device between a main girder and an abutment with a built-in corrugated steel plate and a construction method thereof. Background technique

[0002] The bridge expansion device is a device installed at the expansion joint of the bridge deck in order to make the vehicle pass through the bridge deck smoothly and meet the needs of the bridge deck deformation. The expansion joint directly bears the repeated load of the wheel. Even if there is a small unevenness, the structure will be subject to a great impact under the load of the car, which is easily damaged and needs to be repaired and replaced; at the same time, the design and construction are slightly Defects and deficiencies will lead to early damage; moreover, the stiffness of the expansion joints of the bridge deck changes suddenly, and under the repeated action of f...

Examples

Embodiment Construction

[0074] like figure 1 , figure 2 and image 3 The seamless telescopic device between the main girder and the abutment with built-in corrugated steel plates is shown, which includes prefabricated steel plates and expansion joint filling layer 10 filled above the prefabricated steel plates, and the prefabricated steel plates are arranged on the construction site. On the abutment expansion joint of the bridge, the abutment expansion joint is the expansion joint left between the main girder 11 and the abutment 12 of the constructed bridge; the main girder 11 is covered with a bridge deck pavement structure, and the The outer side of the upper part of the abutment 12 is paved with pavement pavement and the inner side of the upper part is an exposed section of the abutment. A reserved installation for the installation of the prefabricated steel plate parts is formed between the bridge deck pavement structure and the pavement pavement layer. Groove, the length of the longitudinal b...