[0020] Refer to the attached image for the construction method of changing the integral ballast bed into a floating slab ballast bed in the tunnel of the railway operating line. The construction of key points is blocked in the tunnel of the subway operating line. The construction time of the blockade is 4 hours. The specific construction steps are as follows:
[0021] 1) Concrete demolition in the first stage: Use a high-frequency, low-noise wall saw to cut the concrete of the gutters on both sides longitudinally along the ballast bed on the outside of the sleepers, divide them into small pieces with a hand-held saw, chisel them out with electric picks and hydraulic picks, install The bag is transported outside, and the cutting depth is determined by using a special 4.3m long aluminum alloy ruler. According to the tunnel radius and tunnel convergence value, the vertical distance from the cutting surface to the ruler and the horizontal distance from the tunnel center are collecte...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com