A ballastless track arch-up improving method based on
rope saw
cutting includes the following steps of firstly, determining the falling amount of an arch-up section of a ballastless track, and conducting
steel bar embedding and anchoring on the positions, at the two ends of the arch-up section, of the ballastless track; secondly, drilling
rope saw operation holes in the side face of the ballastless track; thirdly,
cutting off concrete of a supporting part of the ballastless track, providing a falling space for the ballastless track, and limiting the
cut ballastless track; fourthly, fine adjusting the ballastless track to fall by a design value, fully filling the lower gap or interlayer gap of the ballastless track with a filling material, and recovering the
route stability; fifthly, conducting
steel bar embedding and anchoring on an improvement area of the ballastless track, fine adjusting a
fastener system and recovering the
route smoothness. By means of the method, the existing structure of the ballastless track cannot be changed, the geometrical state of the ballastless track is stable in the improvement process, the
train driving safety is not affected, and the method can be implemented in the
skylight maintaining time and is suitable for the arch-up improvement of the ballastless track with a high-quality lower concrete force-bearing structure.