Deep hole step blasting method suitable for dam foundation in rich water environment and detachable device used for the method
A technology for dismantling devices and blasting holes, which is applied in blasting and other directions, can solve the problems of limited buffering effect of blasting shock waves, large damage to the bottom of the hole, and limited energy gathering effect of the device, so as to reduce rock mass damage, improve flatness, and facilitate mass production and transport effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0061] The excavation of the protective layer of a reservoir dam foundation adopts smooth blasting, and the blasting hole diameter is Φ 炮孔 =90mm, hole depth 8m, hole spacing 1~1.5m, plugging length 2.5m.
[0062] Specific steps are as follows:
[0063] Step 1, choose the appropriate size detachable unit.
[0064] The dimensions of each structure of the detachable device in this embodiment are as follows:
[0065] PVC pipe outer diameterΦ PVC外 =75mm, PVC pipe thickness δ PVC =2.5mm, PVC pipe inner diameter Φ PVC内 =70mm, PVC pipe height H PVC = 30cm. Energy dissipation seat diameter Φ 消能座 =68mm, height H of energy dissipation seat 消能座 =10cm, the busbar of the conical section of the energy dissipation seat and the bottom surface are 45°, and the height of the conical section is H 锥 =34mm, cylindrical end height H 柱 =66mm; flexible cushion thickness δ 垫 = 20cm. Support rod length H 杆 =1m, support rod diameter Φ 杆 =15mm, the diameter of the cylindrical convex protrusi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 