A concrete expansion joint double water-stop structure fixture
A fixed part and concrete technology, which is applied in the field of fixed parts of concrete expansion joint double water-stop structure, can solve the problems of irregular deformation of concrete grooves, prolonged construction period, difficult cleaning, etc., so as to save installation process, reduce construction period, and prevent cross-section interface errors. moving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0048] Embodiment, referring to the accompanying drawings: a concrete expansion joint double water-stop structure, including a deformation piece 1, a channel steel 2, two deformation pieces 1 are provided on the concrete section, and the two deformation pieces 1 are vertically arranged at a predetermined distance , half of which is pre-embedded in the first-stage concrete 4, and the other half protrudes from the concrete section and is respectively arranged in the corresponding channel steel 2, and the channel steel 2 is provided with asphalt 6; the channel steel 2 Linoleum 3 is provided on the opening surface and the section of the first-stage concrete 4 .
[0049] Further, the deformable sheet 1 is in the form of a rectangular plate with a width of 30-60 cm and a length equal to the height of the concrete section. The side poured into the concrete is bent at 90° with a bending height of 2-5 cm. Two deformable sheets 1 are respectively arranged on The distance between the two...