Floor elevation pay-off review device
A technology of floor and correction device, which is applied in construction, building structure, processing of building materials, etc., can solve the problems of increasing measurement error and time-consuming labor for laying out lines.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The application provides a floor elevation setting-out review device, which reduces the work intensity of the floor elevation setting-out.
[0022] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, not all of them. Based on the embodiments of the present application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present application.
[0023] figure 1 It is a schematic diagram of the structure of the floor elevation setting-out review device provided by this application.
[0024] The following is an explanation of the relevant terms:
[0025] Floor height: the height between the finished surface of the building and the fin...