Gap filling structure and construction method for stone road surface
A construction method and joint filling technology, which is applied in the direction of roads, roads, pavement details, etc., can solve the problems of poor load bearing capacity and poor waterproof effect, and achieve the effect of avoiding damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] In order to facilitate the understanding of the structure of the present invention, the following description will be made in conjunction with the accompanying drawings and embodiments.
[0040] refer to figure 1 , is a schematic cross-sectional structure diagram of the stone pavement filling structure of the present invention, as figure 1 As shown, the present invention firstly provides a stone pavement filling structure. There are gaps between the stone pavement 9. The filling structure includes: a leveling layer 1 poured into the bottom of the gap; a flexible buffer layer 2 poured into the leveling layer 1 ; The filling layer 3 is poured on the flexible buffer layer 2 until the top of the gap.
[0041] Specifically, the leveling layer 1 includes cement slurry, preferably Portland cement as the cement slurry with a thickness of 2 cm, the flexible buffer layer 2 includes asphalt, preferably block dry asphalt with a thickness of 5 cm, and the filling layer 3 is a cemen...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com