A tower crane foundation, tower crane technology, applied in bridge construction, bridges, erection/assembly of bridges, etc., can solve the problems of influence, unfavorable appearance quality of concrete columns, difficult tower crane installation, etc., to reduce tower body structure, reduce construction costs, reduce The effect of rental fees
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0018] Example: as figure 1 , 2 As shown, this embodiment specifically relates to a tower crane foundation setting method applied to a bridge. The bridge is a six-tower single-cable plane short tower beam cable-stayed bridge. The whole bridge has six main towers, and each main tower has a lower structure tower. The height is 21-25M, and the two are symmetrical. The top of the tower is composed of two tie beams.
[0019] The tower crane foundation setting method simplifies the construction method and reduces the construction cost by setting the tower crane foundation on the top surface of the lower tower column, and specifically includes the following steps:
[0020] (1) The concrete pouring of the lower pylon is completed. The lower pylon consists of a column 1, a side tie beam 2 and a middle tie beam 3. The two side tie beams 2 are symmetrically arranged on both sides of the middle tie beam 3, and the three are horizontal and horizontal. It is connected between two vertical...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com