Power grid dispatching operation process risk auxiliary pre-control system

A dispatching operation and power grid dispatching technology, applied in information technology support systems, data processing applications, instruments, etc., can solve problems such as affecting dispatching execution efficiency and effect, lack of dispatching risk early warning and pre-control, and low intelligence level.

Active Publication Date: 2015-12-23
ELECTRIC POWER SCHEDULING CONTROL CENT OF GUIZHOU POWER GRID CO LTD +1
View PDF3 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The specific performance is as follows: (1) It is impossible to process the massive power grid operation data collected, and the dispatching operation relies too much on the manual decision-making of dispatching operators; not only the level of intelligence is low, but also the risk of mis-scheduling is hidden
(2) Lack of practical functions such as scheduling risk early warning and pre-control based on quantitative risk assessment, which seriously affects the efficiency and effect of scheduling execution
[0004] At present, the research on the risk auxiliary pre-control system of power grid dispatching operation process is still in its infancy at home and abroad.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power grid dispatching operation process risk auxiliary pre-control system
  • Power grid dispatching operation process risk auxiliary pre-control system
  • Power grid dispatching operation process risk auxiliary pre-control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0075] The structure of the system of the present invention will be described in detail below in conjunction with specific embodiments.

[0076] 1. Overall structure of the system of the present invention.

[0077] See figure 1 , the system of the present invention includes a human-computer interaction module, a core computing module, a database module and a system auxiliary module, the core computing module and the system auxiliary module are connected to the human-computer interaction module, the core computing module is also connected to the system auxiliary module and the database module, and the database module is connected to the System auxiliary modules and external non-electrical information collection systems. The core computing module further includes a risk assessment module and a risk practical module, wherein the risk assessment module is also connected to external EMS systems (energy management systems), SCADA systems (data acquisition and monitoring monitoring ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a power grid dispatching operation process risk auxiliary pre-control system which comprises a man-machine interaction module, a core computing module and a database module. The core computing module is connected with the man-machine interaction module, the database module and an external system. The database module is connected with the external system. The core computing modules comprises a risk assessment module and a risk practical module. The risk assessment module further comprises a risk assessment auxiliary module and a risk computing module. The risk assessment auxiliary module further comprises an interface management module, an individual order operation sequence generation module and a power grid risk status generation module. The risk assessment module further comprises a risk quantification module and a risk level classification module. According to the invention, intelligent dispatching process risk quantification is realized; and based on risk quantification values, dispatching bill risk verification, dispatching simulation billing risk assessment rehearsal, optimum dispatching time selecting, optimal dispatching scheme selecting and other risk auxiliary pre-control functions are realized.

Description

technical field [0001] The invention relates to the technical field of power grid dispatching operation, in particular to a risk auxiliary pre-control system for power grid dispatching operation process. technical background [0002] With the development of the power industry, the innovation of electrical technology and the continuous access of distributed energy to the power grid, my country's power grid has gradually become a large-scale power grid with complex structure and obvious random fluctuations. The uncertainty of power grid operation is more prominent, which brings a severe test to the power grid dispatching system to control the large power grid and optimize the allocation of large-scale resources. In order to adapt to the above changes and continue to ensure the safe and economic operation of large power grids, it is an inevitable trend for the development of my country's power grid dispatching automation system to improve the intelligence level of dispatching i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCY04S10/50
Inventor 肖倩宏贺先强陈巨龙赵翔宇张旭张丹代江安成朱灵子姚瑶廖兵兵查晓明秦亮黄鹤鸣
Owner ELECTRIC POWER SCHEDULING CONTROL CENT OF GUIZHOU POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products