Power Grid Accident Handling Platform Based on Regulation Integration
A power grid accident and gatekeeper technology, applied in the field of power grid accident handling platform based on the integration of regulation and control, can solve the problem of lack of network topology in the power grid accident handling platform, and achieve the effect of ensuring safe and stable operation, easy expansion, and enhanced correctness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] The power grid accident handling platform based on the integration of regulation and control includes several station-side RTUs, main Layer 2 switches, backup Layer 2 switches, main front-end servers, backup front-end servers, main database server, standby database server, main monitoring Monitoring terminal, physical isolation gatekeeper, data release server, first bus, second bus, third bus, fourth bus, fifth bus;
[0016] Among them, each station-side RTU, main layer-2 switch, and backup layer-2 switch are connected to the fifth bus, and each station-side RTU, main layer-2 switch, backup layer-2 switch, and the fifth bus together form a bus topology;
[0017] Both the main layer 2 switch and the main front-end server are connected to the first bus, and the main layer-2 switch, the main front-end server and the first bus together form a bus topology;
[0018] Both the standby layer 2 switch and the standby front-end server are connected to the second bus, and the stan...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 