A Design Method for Cementing Annulus Slurry Column Structure
A technology of slurry column structure and design method, which is applied in earthwork drilling, wellbore/well components, sealing/isolation, etc., can solve the problem of incomplete consideration of factors affecting cementing annular slurry column pressure, and achieve convenient scheme design and on-site construction personnel, the effect of accurate design results and simple calculation process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0080] Example 1: Taking Well XX-1 as an example, the application of the present invention is described in detail.
[0081] Well XX-1 is a vertical well with a drilling depth of 3000m and a drilling fluid density of 1.20g / cm 3 , the fracture (leakage) pressure of the formation is 54.9PMa, the well section of the oil and gas layer is 2700m-3000m, the cement is required to return to a depth of 2000m, and the annular friction when the cementing construction is replaced in place is 1.5MPa, and the design of the cementing annular slurry is reasonable column structure.
[0082] Step 1: Determine the maximum pressure generated by the slurry column on the formation when the displacement is in place.
[0083] 1. Hydrostatic column pressure of quick-setting cement slurry: 1.90g / cm for quick-setting cement slurry 3 The conventional density, the height is 3000m-2700m=300m.
[0084] P 速 =1.90g / cm 3 ×300m×9.8m / s=5.59MPa
[0085] 2. Hydrostatic column pressure of retarded cement slurry...
example 2
[0106] Example 2: Taking well XX-2 as an example, the application of the present invention is described in detail.
[0107] Well XX-2 is a vertical well with a drilling depth of 3800m and a drilling fluid density of 1.40g / cm 3 , the fracture (leakage) pressure of the formation is 69.5PMa, the well section of the oil and gas layer is 3000m-3800m, the cement is required to be returned to a depth of 2500m, and the annular friction resistance when the cementing construction is replaced in place is 2.0MPa, the design of a reasonable cementing annular slurry column structure.
[0108] Step 1: Determine the maximum pressure generated by the slurry column on the formation when the displacement is in place
[0109] 1. Hydrostatic column pressure of quick-setting cement slurry: 1.90g / cm for quick-setting cement slurry 3 The conventional density, the height is 3800m-3000m=800m.
[0110] P 速 =1.90g / cm 3 ×800m×9.8m / s=14.90MPa
[0111] 2. Hydrostatic column pressure of retarded cement...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com