Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

42results about How to "Avoid pressure leakage" patented technology

Pipe string for well completion and cementation and method

The invention discloses a pipe string for well completion and cementation and a method, and belongs to the field of oil exploitation equipment. The pipe string comprises a sleeve string, an upper packer, an annular hollow casing, a lower packer, a ball base casing and a float shoe which are connected and communicated with one another from top to bottom. The pipe string also includes a ball base arranged in the ball base casing through shearing nails, a cement slurry outlet hole is formed in the upper end of the upper packer, and a cement slurry inlet hole is formed in the lower end of the lower packer. An annular cavity is formed in the wall of the annular hollow casing, and the upper and lower ends of the cavity are communicated with the cement slurry outlet hole and the cement slurry inlet hole respectively. By using the upper and lower packers to isolate an oil layer, cement slurry is not directly in contact with the oil layer, pollution caused by the cement slurry to the oil layeris avoided, the cement slurry is prevented from extruding the oil layer and causing a leakage problem, and the leakage problem of the oil layer is solved. In short, the pipe string for the wall completion and cementation and the method can not only ensure well completion and cementation operation but also increase the success rate of the well completion and cementation operation.
Owner:PETROCHINA CO LTD

Subgrade rolling monitoring system and calculation method of number of subgrade rolling times based on RGB algorithm

InactiveCN108330783AAvoid pressure leakageGuarantee construction qualityRoads maintainenceSubgradeTime based
The invention discloses a subgrade rolling monitoring system and calculation method of the number of subgrade rolling times based on an RGB algorithm. By setting the RGB value of the number of rollingtimes by a road roller every time, a certain rolling area is expressed by a point on a screen, the computer screen initial display RGB value is (255 255 255), the RGB values of corresponding points on the screen are changed in real time according to the rolled position and the rolled area by the road roller, real-time monitoring is conducted on the number of on-site rolling times, and the road roller is commanded to operate. After construction is completed, by analyzing the RGB values, the number of points reaching the required rolling number of times can be obtained, and qualified points andunqualified points are displayed on the screen visually. Through rolling state images displayed by the system in real time, the phenomena of rolling leakage and less rolling can be avoided, and oncethe phenomena of rolling leakage and less rolling are found, construction personnel can conduct instant rolling supplement. Meanwhile, the construction personnel can also avoid the overpressure site and the overpressure phenomenon, and redundant work which is unnecessary and even unfavorable to the construction quality is reduced.
Owner:广州市微柏软件股份有限公司

Elastic mesh type straw compression pair roller

The invention provides an elastic mesh type straw compression pair roller and belongs to the technical field of straw compression machines. The pair roller comprises a first compression roller assembly and a second compression roller assembly which are identical in structure and opposite in direction. Each compression roller assembly is composed of a left end cover assembly, a compression roller shaft assembly, a roller cylinder assembly, an elastic piece assembly, a rubber strip assembly and a right end cover assembly. The connection modes of the parts of the two compression roller assembliesare the same, but the elastic pieces are differently arranged. The elastic piece of the first compression roller is arranged in a left-handed mode, the elastic piece of the second compression rolleris arranged in a right-handed mode, and the elastic pieces are spirally meshed and installed to achieve elastic mesh type compression of straw. By means of the pair roller, forced pushing and feedingfor straw compression can be realized; meanwhile, the straw with different shape characteristics is subjected to elastic compression, the problems that in the straw compression process, the straw slides, is difficult to feed into the machine, is subjected to missing compression or is not compacted are solved, continuous high-strength compression can be realized, and the straw compression effect and efficiency are improved.
Owner:JILIN UNIV

Expansion core type mechanical device for replacing valve under pressure

The invention relates to the technical field of gate valve replacing devices, particularly to an expansion core type mechanical device for replacing a valve under pressure. The expansion core type mechanical device comprises a fixed rack, an ejector rod, a connecting disk, a pushing disk, a process flange and a sealing flange, wherein at least two double-thread screws are fixed between the fixed rack and the connecting disk, at least one hydraulic cylinder is fixed on the connecting disk, a penetrating hole is formed in the middle of the connecting disk, a piston rod is arranged in the hydraulic cylinder and fixed with the pushing disk together, the right end of the ejector rod is fixed on the pushing disk, and the middle of the ejector rod is located in the penetrating hole. The expansion core type mechanical device is reasonable and compact in structure and convenient to use, gate valves can be replaced under pressure, in the gate valve replacing process, the good sealing performance can be guaranteed, the pressure leakage can be prevented, and the pollution and killing of oil reservoirs due to well-killing gate valve replacement can be avoided, so that the resurrection operation of killed oil reservoirs is avoided, meanwhile, the pollution discharge operation of polluted oil reservoirs is avoided, and the oil and gas production cost is saved.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Mining downward drilling, water draining, slag discharging and extraction integrated equipment and gas extraction method

The invention discloses mining downward drilling, water draining, slag discharging and extraction integrated equipment which comprises an extraction pipe, and the lower end of the extraction pipe is open; a central pipe is coaxially sleeved with the extraction pipe, a plurality of extraction holes are evenly formed in the bottom of the side wall of the extraction pipe, an extraction cavity is defined between the central pipe and the extraction pipe, an extraction connector and a deslagging connector are arranged at the top of the side wall of the extraction pipe, the extraction connector is connected with a gas extraction pipeline, and the deslagging connector is used for being connected with a deslagging pipe which is led into a roadway drainage ditch; an extraction electromagnetic valveis arranged on the gas extraction pipeline, and a deslagging electromagnetic valve is arranged on the deslagging pipe; and the upper end of the extraction pipe is closed, the upper end of the centralpipe is connected with a water injection pipe through a water injection electromagnetic valve and connected with a gas injection pipe through a gas injection electromagnetic valve. The invention further discloses a corresponding gas extraction method. The mining downward drilling, water draining, slag discharging and extraction integrated equipment is suitable for downward gas extraction holes, coal cinder and accumulated water accumulated in extraction holes can be conveniently discharged, a water seal effect is eliminated, water in the holes is reduced, the air permeability of coal bodies around the extraction pipe is improved, and the gas extraction efficiency is improved.
Owner:HENAN POLYTECHNIC UNIV

An adjustable double-cover double-compression pressure vessel

The invention discloses an adjustable double cover body double-pressing-type pressure vessel. The adjustable double cover body double-pressing-type pressure vessel comprises a tank body, a tank cover, a movable bracket adjustable in height and an adjustable type pressing device, wherein the tank cover is installed on the tank body, and the adjustable type pressing device is installed on the movable bracket. An upper circular ring installation plate and a lower circular ring installation plate are arranged at the joint of the tank cover and the tank body, and the tank cover is further provided with a hydraulic opening. The hydraulic opening is provided with a detachable hydraulic cover. According to the adjustable double cover body double-pressing-type pressure vessel, the closing mode of two door covers is also of a pressing type, door slots between the two door covers can be all pressed and blocked through long-strip pressing plates installed on a second hydraulic cylinder, and in this way, opening and closing of the door covers are very convenient; moreover, each long-strip pressing plate is provided with a sealing rubber pad, after the door slots are pressed through the sealing rubber pads, the sealing performance can be improved, and pressure leakage is prevented; and in addition, clamping blocks arranged on the long-strip pressing plates are pressed into clamping grooves in the door covers during pressing, not only can positioning be conducted, but also the stability can be reinforced, the impact resistance is improved, and the situation that the door covers are opened due to excessive pressure or accidental causes is prevented.
Owner:武汉天海鸿运科技发展有限公司

Construction method for test section of earthwork backfill engineering

The invention discloses a construction method for a test section of earth-rock backfill engineering, and relates to the technical field of earthwork backfill construction. The construction method comprises the following steps: (1) selecting a typical roadbed with a length of not less than 100 m as a corresponding test section, and calculating main roadbed filling parameters; (2) conducting surveying and setting out, leveling a substrate, and conducting paving on site according to a test paving thickness; (3) conducting rough leveling by using a bulldozer, conducting leveling on site to adjustthe paving thickness, and conducting fine leveling by using a land leveler; (4) using a heavy vibratory roller for rolling compaction in a mode of first light pressing and then heavy pressing, first pressing at a slow speed and then pressing a high speed and from two sides to the middle, wherein wheel marks are required to be overlapped by 40-50 cm after two adjacent times of compaction; and (5) measuring the compaction degree of the roadbed after the sixth time in the step (4) by adopting a sand filling method, making detailed records, distinguishing the rolling compaction times with the compaction degree reaching 90% or above, and determining the technological parameters of earthwork backfill construction. The method has the advantages of accurate test result and prevention of problems in formal construction.
Owner:中冶成都勘察研究总院有限公司

Construction method for efficient layered backfilling of earthwork

The invention discloses a construction method for efficient layered backfilling of earthwork, and relates to the technical field of backfilling construction of earthwork. The construction method comprises the following steps: (1) substrate treatment; (2) layered filling: before filling compaction, the loose laying thickness is not greater than 25 cm and not less than 12 cm; (3) paving and leveling: earthwork is transported from an excavation area to a soil filling area; (4) watering and drying in the sun: the water content of a filler measured on site is compared with an optimal water content,and when the water content exceeds +/-2%, the filler is watered or dried in the sun; (5) rolling: in a rolling process, a road roller is used for conducting prepressing once in a mode of first lightpressing and then heavy pressing from a low position to a high position and from a side to the middle, then flattening is carried out by a bulldozer and then rolling is carried out; (6) detecting: thewater content and the compaction degree of the filled soil are detected; and (7) filling construction of an uppermost layer of soil: an accurate virtual height is reserved according to the field soiltexture and the field pressure test condition. The method has the advantages that the overall construction is standard, the rework probability is greatly reduced, and the construction efficiency is high.
Owner:中冶成都勘察研究总院有限公司

Method for detecting transverse compactness and uniformity of roadbed

The invention discloses a method for detecting transverse compactness and uniformity of a roadbed. The method comprises the steps that before a roadbed to be compacted is compacted, whether a first linear regression equation K = aF<SE> + b and a second linear regression equation s = cI<n> + d can be obtained or not is judged, wherein in the formulas, K is the transverse compactness, F<SE> is the resultant force of the counter force of a compacted layer, s is a transverse compactness uniformity parameter, and I<n> is a transverse uniformity index; if yes, the first linear regression equation and the second linear regression equation are obtained; acceleration information of a road roller is acquired in the process of compacting the roadbed to be compacted; the resultant force of the counter force of the compacted layer and the transverse uniformity index of the compacted layer are calculated according to a calculation rule and the acceleration information; and the transverse compactness of the roadbed to be compacted is determined according to the resultant force of the counter force of the compacted layer and the first linear regression equation, and the transverse compactness uniformity parameter of the roadbed to be compacted is determined according to the transverse uniformity index of the compacted layer and the second linear regression equation. According to the method, the transverse compactness and uniformity of the roadbed can be detected in real time.
Owner:CCCC FOURTH HARBOR ENG INST +1

A device for measuring and controlling the crimping position of an aluminum crimping tube of a transmission line

The invention discloses a device for measuring and controlling the crimping position of an aluminum crimping pipe of a power transmission line, comprising a first clamping plate, wherein the first clamping plate is in an "L" shape, and one end of the first clamping plate is connected with a scale in the "L" shape, A sliding block is slidably connected to the scale, and steel arms are respectively fixed at both ends of the sliding block; a second clamping plate is arranged opposite the first clamping plate, and the first clamping plate and the second clamping plate clamp the steel anchor hanging ring , one end of the steel anchor hanging ring is pressed against the limit plate of the first splint; connected to the connecting part of the steel anchor hanging ring, the steel anchor connected to the connecting part passes through the pipe along the length of the scale direction extension. In the present invention, by aligning the steel arm with the end of the connecting portion or the end of the wire, when the aluminum crimping pipe is sleeved on the connecting portion, the outer wall of the aluminum crimping pipe can be pressed against the steel arm by pressing the steel arm. Leave traces, and squeeze the aluminum crimping tube according to the traces, so as to avoid the occurrence of leakage or overvoltage of wires or connecting parts.
Owner:国网山东省电力公司建设公司 +2

Volute, fan and range hood

PendingCN113833671AReduce noiseMitigate Noisy Technical IssuesDomestic stoves or rangesPump componentsPhysicsEngineering
The invention relates to the technical field of kitchen appliances, in particular to a volute, a fan and a range hood. The volute comprises a first air duct plate, a second air duct plate and a side plate arranged between the first air duct plate and the second air duct plate, wherein an inner cavity is formed among the first air duct plate, the second air duct plate and the side plate; and a silencing assembly capable of absorbing noise is arranged on the side, close to the inner cavity, of the side plate. The fan comprises the volute. The range hood comprises the fan. According to the volute, the fan and the range hood provided by the invention, the technical problem that in the prior art, noise at the position of the fan is large in the running process of the range hood is solved.
Owner:HANGZHOU ROBAM APPLIANCES CO LTD

Well cementing and completion pipe string and method

The invention discloses a pipe string for well completion and cementation and a method, and belongs to the field of oil exploitation equipment. The pipe string comprises a sleeve string, an upper packer, an annular hollow casing, a lower packer, a ball base casing and a float shoe which are connected and communicated with one another from top to bottom. The pipe string also includes a ball base arranged in the ball base casing through shearing nails, a cement slurry outlet hole is formed in the upper end of the upper packer, and a cement slurry inlet hole is formed in the lower end of the lower packer. An annular cavity is formed in the wall of the annular hollow casing, and the upper and lower ends of the cavity are communicated with the cement slurry outlet hole and the cement slurry inlet hole respectively. By using the upper and lower packers to isolate an oil layer, cement slurry is not directly in contact with the oil layer, pollution caused by the cement slurry to the oil layeris avoided, the cement slurry is prevented from extruding the oil layer and causing a leakage problem, and the leakage problem of the oil layer is solved. In short, the pipe string for the wall completion and cementation and the method can not only ensure well completion and cementation operation but also increase the success rate of the well completion and cementation operation.
Owner:PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products