Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

110 results about "Cementation process" patented technology

The cementation process is an obsolete technology for making steel by carburization of iron. Unlike modern steelmaking, it increased the amount of carbon in the iron. It was apparently developed before the 17th century. Derwentcote Steel Furnace, built in 1720, is the earliest surviving example of a cementation furnace. Another example in the UK is the cementation furnace in Doncaster Street, Sheffield.

Visual system for testing cementation quality of specially-shaped well cementation interface II and intensity of specially-shaped body

The invention relates to the technical field of detection of the cementation quality of a well cementation interface II, in particular to a visual system for testing the cementation quality of a specially-shaped well cementation interface II and the intensity of a specially-shaped body. A simulated formation cavity and a well cementation cement/cement stone cavity are communicated to form an experimental cavity, and a perpendicular communicated surface is an interface II; circular sealing retainer rings are respectively arranged at the top and the bottom of the experimental cavity; a cement stone lifting die is arranged at the lower part of the well cementation cement/cement stone cavity; a thermocouple is arranged in the simulated formation cavity; multiple reaction gas injection pipes are arranged in the simulated formation cavity; visual windows are respectively formed in the sides of the simulated formation cavity and the well cementation cement/cement stone cavity; a sealing coveris arranged at the top of the simulated formation cavity; the top of the well cementation cement/cement stone cavity is sealed and is provided with a gas-liquid inlet/outlet. The device can be used for evaluating the cementation quality of the interface II and testing soil in a soft soil stratum and the quality of a cemented surface of cement in a well cementation process of a hydrate-containingstratum.
Owner:CHENGDU UNIVERSITY OF TECHNOLOGY

Cyclic heating rapid nitridation catalytic cementation process

The invention relates to a circular-heating rapid nitriding catalysis process which comprises the following steps: ammonia gas is injected to discharge air after workpiece is put into a nitriding furnace; the nitriding furnace is heated from room temperature to T1 temperature and T2 temperature with two sections of heat insulation; and then another two section of heating and heat insulation are carried out at T1temeprature and T2 temperature; the ammonia gas resolution ratio is controlled within the range of 18-60 percent, and the nitriding is carried out; a thickening process is carried out by fully utilizing the strong-nitriding high-speed step, the depth of a nitriding layer and the nitriding time according to a plurality of parabolas with different P values; white powders of nitriding catalysis agent containing chlorinated rare-earth elements are put into a steel tube along with the workpiece from the nitriding charge, wherein the nitriding catalysis agent comprises the following components according to percentages by weight of 3-10 percent of chlorinated rear-earth, 5-35 percent of ammonium chloride, 20-50 percent of calcium chloride and 20-55 percent of sodium carbonate; two ends of the steel tube are tightly bound by aluminum silicate fiber or rock wool and are then put into the furnace, and the nitriding catalysis agent can play a nitriding effect during the whole nitriding process. The invention improves the absorption capacity of the surface of the workpiece to active nitrogen atoms, accelerates the nitriding speed of the nitrogen atoms, shortens the nitriding insulation time by more than 44.4 percent, saves the electrical energy by more than 32 percent and shortens the production period by more than 32.7 percent.
Owner:远立贤

Cementation and fracture technique string and cementation and fracture technique process

The invention discloses a cementation and fracture technique string and a cementation and fracture technique process. The cementation and fracture technique string sequentially comprises a float shoe, a float collar, a collision base, a cementation pressure differential sliding sleeve and a cementation dropping sliding sleeve from bottom to top, wherein the float shoe, the float collar, the collision base, the cementation pressure differential sliding sleeve and the cementation dropping sliding sleeve are connected through a casing pipe, and the cementation pressure differential sliding sleeve is provided with a constant pressure valve. The cementation and fracture technique process comprises the steps of a well cementation process including tripping the cementation and fracture technique string into a wellhead, pouring cement paste into the cementation and fracture technique string, and waiting on cement setting after a rubber plug moves to the collision base, and a fracture process including pressurizing the cementation and fracture technique string from the ground to open the constant pressure valve arranged on the cementation pressured differential sliding sleeve and then performing fracture. The cementation and fracture technique string is low in rigidity, can be tripped into stratums very conveniently, and meanwhile can achieve good packing effects.
Owner:TIANJIN ANTON PETROLEUM MACHINERY MFG

Novel casing pipe restoration reinforcing agent, preparation method and construction method thereof

The invention discloses a novel casing pipe restoration reinforcing agent, a preparation method and a construction method thereof. A formula comprises epoxy resin, curing agents, alloy powder, modified carbon fiber, coupling agents, dispersing agents and organic solvents. The formula provided by the invention can be used for oil gas field casing damage well casing pipe restoration and reinforcement; a grading hoop is used in the well cementation process; the casing pipe pressure-resistant grade cannot meet the oil gas well casing pipe restoration and reinforcement with high high-construction-pressure fracturing construction pressure resistant requirements. The casing pipe restoration reinforcing agent prepared by using the formula and the preparation method can realize the curing at the normal temperature and stratum temperature in a certain time; before curing, the viscosity is low; the flowability is high; the pumping injection is easy; after curing, the intensity and the material are similar to those of the casing pipe; the materials can be well fused with the metal casing pipe; after curing, the sealing effect is good after restoration on the sleeve damage position; the effective period is long; the anti-tension and pressure-resistant intensity is high; the bonding intensity with the metal sleeve is high; the acid and alkali resistance and anti-corrosion performance are realized; the damaged part of the restored casing pipe can be enabled to have the identical inner diameter with the original casing pipe; the diameter shrinkage and the diameter change cannot occur; thelater stage taking out tools and pipe columns are not influenced.
Owner:谢翠娥 +1

Followed vibration well cementation method

ActiveCN102108846AReach standbyOvercoming a single functionVibration devicesSealing/packingThermodynamicsWell cementing
The invention discloses a followed vibration well cementation method. In the method, in the well cementation process, a rubber plug moves in a sleeve downwards and simultaneously vibrates, and after the rubber plug moves downwards to the well bottom and touches and presses a float collar to make the float collar stop, the rubber plug continuously vibrates until cement slurry is about to be jelled. Through the method, the followed vibration in the whole well section from the well mouth to the well bottom can be implemented, the defect of single function of the rubber plug is overcome, and the aim of moving the sleeve of the whole well section is fulfilled, so that the sleeve and cement interface cementing quality is improved, the cement stone strength is improved and better application effect is achieved; and on the basis of not changing the conventional production and construction processes, the replacement function of the conventional rubber plug is still utilized, a sleeve resonanceprinciple is applied, and when the rubber plug moves in the sleeve, the followed vibration in the whole well section from the well mouth to the well bottom is implemented, so that the defect of single function of the rubber plug is overcome, vibration waves having the frequency same as the natural frequency of the sleeve of the oil well can be generated, and the well cementation quality is effectively and obviously improved.
Owner:XIAN MANYUAN ELECTROMECHANICAL EQUIP CO LTD +1

Experimental method of simulating cementing in well cementation process

The invention relates to an experimental method for simulating cementing in a well cementation process. The experimental method comprises the following steps: firstly assembling experimental equipment, wherein the experimental equipment comprises a shaft simulating system, a drilling fluid circulating system, a cementing system and a computer data processing system, and the shaft simulating system comprises an inner organic glass tube for simulating a drill column, an outer organic glass tube for simulating a casing pipe, an internal rotating motor and a check valve; secondly, simulating drill fluid direct circulation, direct circulation of cementing in the well cementation process, drill fluid reverse circulation, and reverse circulation of cementing in the well cementation process. The experimental method has the benefits as follows: the method is simple and easy to operate, students can personally carry out simulation operations, so as to understand direct circulation of cementing in the well cementation process, reverse circulation of drill fluid and reverse circulation of cementing intuitively and visually, the enthusiasm of the students for learning can be kindled, and the understanding and mastering of students for direct circulation of cementing and reverse circulation of cementing in the well cementation process can be deepened.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Stainless steel low-temperature powder embedding iron-aluminum co-cementation agent and pack-cementation process method

The invention discloses a stainless steel low-temperature powder embedding iron-aluminum co-cementation agent and a pack-cementation process method. The stainless steel low-temperature powder embedding iron-aluminum co-cementation agent is characterized in that aluminum powder is taken as main an aluminum supplying agent, iron powder is a main iron supplying agent, iron-aluminum powder is taken as active filler to replace the conventional inactive ceramic powder filler, aluminum trichloride is taken as an activating agent, and a small amount of rare earth chloride can be added to be used as a catalyst; and a process comprises the following steps of: completely and uniformly mixing the cementation agent, then putting the cementation agent and a stainless steel sample to be subjected to iron-aluminum copermeation processing into a cementation tank, mixing sodium silicate with fire clay, carrying out sealing and drying, so as to obtain an iron-aluminum compound alloy layer with the certain thickness, wherein the alumetizing temperature is 380-600 DEG C, and the temperature is kept for 10 or more than 10 hours. The stainless steel low-temperature powder embedding iron-aluminum co-cementation agent has the advantages that the process method is simple, devices required for low-temperature embedding iron-aluminum co-cementation are simple, the cost is low, the aluminum content of the surface of the obtained iron-aluminum compound alloy layer is high, the iron-aluminum compound alloy layer has a very strong binding force with a matrix and good intermediate temperate oxidation resistance and corrosion resistance and can well protect the matrix.
Owner:NANCHANG HANGKONG UNIVERSITY

Sectioned well cementation technology for deep trona drilling and mining

InactiveCN108361001ASolve the problem of not being able to returnSolve the problem of not being able to return cementSealing/packingWell drillingWell cementing
The invention discloses a sectioned well cementation technology for deep trona drilling and mining. The sectioned well cementation technology comprises the following steps that firstly, a whole wellbore is sectioned, and a formation packer and a grading hoop are mounted on a well cementation sleeve in a series-connection mode; then the lower sleeve well section is sealed and reinforced by adoptinga positive circulation method, a rubber plug of the formation packer is opened firstly, thus the rubber plug and the well wall are sealed, a cement down channel is cut off, then the grading hoop is opened, and first-stage cementing well cementation operation is started; after cement slurry is injected, the grading hoop is closed; after the cement slurry is initially solidified, second-stage cementing well cementation operation is conducted on the upper well section; and after cement is solidified, the rubber plug is drilled, a center pipe is lowered in, and well completion is achieved. A whole well is divided into the two parts according to geologic conditions and downhole conditions, the problems that in the previous first-time well cementation process, the pressure intensity is high, astratum is prone to being pressed to leak, or up-hole of an upper cement slurry face of a leakage layer is not high are solved, the well completion quality is greatly improved, and the service life ofthe production well is prolonged.
Owner:HENAN ZHONGYUAN CHEM

A drilling liner pressure control well cementation process

InactiveCN109723403AReduce the risk of cementing constructionReduce construction riskSealing/packingWell cementingCementation process
The invention discloses a drilling liner pressure control well cementation process, and belongs to the technical field of oil and gas development well cementation. The drilling liner pressure controlwell cementation process sequentially comprises a casing running stage, a drilling liner hanger seating and hanging stage, a cementing and replacing stage, a bump pressure and drill string pulling-outstage and a setting waiting stage. In the casing running stage, the drilling liner hanger seating and hanging stage, the cement injecting and replacing stage, the bump pressure and drill string pulling-out stage and the waiting stage, the well bottom circulation equivalent density of the narrow safety density window well section is kept between the pore pressure equivalent density and the rupturepressure equivalent density corresponding to the narrow safety density window well section by controlling the wellhead annulus pressure. According to the well cementation technology, through wellheadannulus pressure control, the well bottom circulation equivalent density corresponding to the narrow safety density window well section is made to be between the pore pressure equivalent density andthe rupture pressure equivalent density, it is guaranteed that a pressure-bearing weak stratum is not pressed to leak while the oil and gas display layer is pressed stably, the drilling liner well cementation construction risk is reduced, and the well cementation quality is improved.
Owner:PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products