Rapid continuous construction method for diversion tunnel temporary plug

The technology of diversion tunnel and plug is applied in the field of rapid and continuous construction of temporary plug concrete for diversion tunnel, which can solve the problems of high engineering difficulty, increased tension during construction period, poor processing and construction site conditions, etc. Shorten the construction time and ensure the effect of fullness

Inactive Publication Date: 2016-03-16
中国安能集团第一工程局有限公司
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] During the construction of the hydropower station, as the gate is gradually lowered, the water level will become higher and higher. In order to prevent the gate from being leaked or even damaged under high water level conditions, it will pose a threat to the safety of the construction personnel in the cave, and even cause the hydropower station to fail. The failure of the lower sluice to store water has brought immeasurable losses. The current construction method is generally to add temporary plugs upstream of each diversion tunnel, but there are some technical difficulties in the construction of the temporary plugs at present. Later, the reservoir began to store water at the initial stage. As the water level rose, the water level of the reservoir also rose rapidly. The safety problem of the construction was very prominent, and the construction period was also very tight. In addition, the bottom of the diversion tunnel outlet was heavily silted, which made the construction of the cofferdam more difficult. , pumping and draining and dredging in the cave takes a long time, which also increases the tension during the construction period, and the conditions of the processing and construction site are poor, so it is quite difficult to use temporary plugs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0018] The method for fast and continuous construction of the temporary plug of the diversion tunnel according to the present invention, its main steps are:

[0019] (1) Before the construction of temporary plug concrete, scaffolding shall be set up inside and outside the pouring warehouse. The scaffolding in the warehouse is the supporting platform for concrete pouring and concrete delivery pipelines, and the scaffolding outside the warehouse is the formwork assembly, transfer construction platform and the passage for construction personnel to work up and down;

[0020] (2) The two sides of the scaffolding in the warehouse are adjacent to the two concrete side walls;

[0021] (3) The template for the concrete end of the temporary plug of the diversion tunnel adopts a stereotyped combination of steel templates, which are fixed by inner pulls and inner braces. The tie bars are connected to the scaffold at an angle of 45 degrees. The templates are assembled manually. First set u...

Embodiment 2

[0029] The method for fast and continuous construction of the temporary plug of the diversion tunnel according to the present invention, its main steps are:

[0030] (1) Before the construction of temporary plug concrete, scaffolding shall be set up inside and outside the pouring warehouse. The scaffolding in the warehouse is the supporting platform for concrete pouring and concrete delivery pipelines, and the scaffolding outside the warehouse is the formwork assembly, transfer construction platform and the passage for construction personnel to work up and down;

[0031] (2) The two sides of the scaffolding in the warehouse are adjacent to the two concrete side walls;

[0032] (3) The template for the concrete end of the temporary plug of the diversion tunnel adopts a stereotyped combination of steel templates, which are fixed by inner pulls and inner braces. The tie bars are connected to the scaffold at an angle of 45 degrees. The templates are assembled manually. First set u...

Embodiment 3

[0040] The method for fast and continuous construction of the temporary plug of the diversion tunnel according to the present invention, its main steps are:

[0041] (1) Before the construction of temporary plug concrete, scaffolding shall be set up inside and outside the pouring warehouse. The scaffolding in the warehouse is the supporting platform for concrete pouring and concrete delivery pipelines, and the scaffolding outside the warehouse is the formwork assembly, transfer construction platform and the passage for construction personnel to work up and down;

[0042] (2) The two sides of the scaffolding in the warehouse are adjacent to the two concrete side walls;

[0043] (3) The template for the concrete end of the temporary plug of the diversion tunnel adopts a stereotyped combination of steel templates, which are fixed by inner pulls and inner braces. The tie bars are connected to the scaffold at an angle of 45 degrees. The templates are assembled manually. First set u...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a rapid continuous construction method for a diversion tunnel temporary plug, and relates to a building construction method, in particular to a rapid continuous construction method for diversion tunnel temporary plug concrete used in the process of hydropower engineering construction. The construction method comprises the main steps that (1) scaffolds are built inside and outside a pouring cabin before constructing of the temporary plug concrete; (2) the two sides of the scaffolds inside the pouring cabin are adjacent to two concrete sidewalls; (3) an end formwork of the diversion tunnel temporary plug concrete uses a standard combined steel formwork; (4) the temporary plug concrete is constructed through temperature control; (5) pouring of the concrete on the top of the cabin is conducted; and (6) the concrete is conveyed into the top of the cabin through a concrete pump, the cabin is leveled and vibrated by labors, and a standby concrete conveying tail pipe is arranged. According to the rapid continuous construction method for the diversion tunnel temporary plug, the construction time is effectively shortened, and the construction conditions on a work site are improved.

Description

technical field [0001] The invention relates to a building construction method, in particular to a method for rapid and continuous construction of concrete for temporary plugging of diversion tunnels in the construction process of hydropower projects. Background technique [0002] During the construction of the hydropower station, as the gate is gradually lowered, the water level will become higher and higher. In order to prevent the gate from being leaked or even damaged under high water level conditions, it will pose a threat to the safety of the construction personnel in the cave, and even cause the hydropower station to fail. The failure of the lower sluice to store water has brought immeasurable losses. The current construction method is generally to add temporary plugs upstream of each diversion tunnel, but there are some technical difficulties in the construction of the temporary plugs at present. Later, the reservoir began to store water at the initial stage. As the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02B3/16E02D15/02
CPCE02B3/16E02D15/02
Inventor 贺博文田承洋刘胜崔东张礼宁柴喜洲陈忠林郭伟仇建
Owner 中国安能集团第一工程局有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More