Unlock instant, AI-driven research and patent intelligence for your innovation.

Steel rail damaged connector in-situ welding construction technology

A construction technology and rail technology, applied in the direction of track, track laying, track maintenance, etc., can solve the problem that it is difficult to accurately reflect the structural failure of the transformer, and achieve the effect of reducing material consumption, reducing processing time, and saving time

Active Publication Date: 2016-04-20
CHINA RAILWAY 11TH BUREAU GRP +1
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem to be solved by the present invention is to provide an in-situ welding construction technology for rail defect joints to solve the problem that a single detection method is difficult to accurately reflect the structural fault of the transformer, and to improve the reliability of structural fault diagnosis of the transformer

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel rail damaged connector in-situ welding construction technology
  • Steel rail damaged connector in-situ welding construction technology
  • Steel rail damaged connector in-situ welding construction technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In order to make the object, technical solution and advantages of the present invention clearer, the specific implementation methods of the present invention will be further described in detail below. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0031] A rail defect joint in-situ welding construction process is characterized in that it includes the following steps:

[0032] Step 1: Query the rail temperature during welding and release of the original rail, the actual rail burning loss of the flash welder, calculate the elongation of the rail, check the condition of the welder, arrange loosening and unloading fasteners, rail bending, and pre-welding treatment of the rail and post-weld handlers;

[0033] Step 2: Periodically investigate the rail temperature. When the rail temperature is lower than the stress relief temperature, vertically saw off the rail defect ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a steel rail damaged connector in-situ welding construction technology. Damaged connectors are mainly processed according to the steps of making preparation for construction, sawing the connectors at low temperature, releasing a steel rail fastener, making the steel rail elongation meet requirements, bending a steel rail, aligning the correctors, thermally processing the connector after welding and finally locking the steel rail. The construction technology is applicable to processing damaged connectors of a newly-built line and an existing line steel rail. Processing time can be shortened, time is saved for intensive later-period welding construction of the steel rail, transporting and rail welding construction staff are reduced, and material consumption of the steel rail and connector welding is reduced. The number of the steel rail connectors is not increased, it is avoided that because the number of the connectors is increased, the risk of the damaged connectors is increased, and the later-period running and maintaining workload is not increased; raw materials of the steel rail are saved, and the damaged connectors can be processed in a more economical and efficient mode.

Description

technical field [0001] The invention belongs to the technical field of welding technology, and more specifically relates to an in-situ welding construction technology for rail defect joints. Background technique [0002] With the rapid development of my country's railway construction, especially after several domestic passenger dedicated lines have realized track seamlessness through advanced rail welding technology, by improving the smoothness and overall strength of the line, the driving conditions of the train have been greatly improved, ensuring that the train Maintain a good level of comfort at high speeds. The newly-built railway transports a certain length of long steel rails to the site by long-rail transport vehicles and lays the long rails at the same time. By welding the long steel rails into long rails of considerable length, a seamless line across intervals is formed. At present, the on-site rail welding methods mainly include mobile flash welding, thermite weld...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01B31/18
CPCE01B31/18
Inventor 周涛杨凌清
Owner CHINA RAILWAY 11TH BUREAU GRP