Power plant and substation electric quantity acquisition device-based testing system and method
A technology of electricity collection and testing system, applied in the direction of measuring electrical variables, instruments, measuring devices, etc., can solve the problems of increasing the difficulty of system operation and maintenance, the inability of equipment and systems to communicate with each other, and system instability, so as to reduce equipment differences Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0031] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings and embodiments. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them.
[0032] Please see figure 1 It is a structural schematic diagram of the test system based on power collectors for power plants and substations of the present invention. A test system based on power collectors in power plants and substations of the present invention realizes functional testing and protocol testing of collectors in power plants and substations, so as to facilitate verification of correct functions of access devices, accurate data collection, and normal communication. The test system includes There are: a detection device 11 , a collector 13 , a switch 12 , a terminal server 14 and at least one electric energy meter. In this embodiment, two electric energy meters, the first electri...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

