Embodiment 1
[0052] like figure 1 The shown method for restoring power supply of urban power grid based on 10kV special feeder backup and self-switching includes the following steps:
[0053] Step 1, capturing the bus voltage loss signal;
[0054] Step 2, carry out the determination criterion of pressure loss;
[0055] Step 3: After confirming the loss of voltage, the function of feeder backup automatic switching is started, and the safety isolation plan is obtained first by starting analysis; The time is 2S, and the action time of 10kV standby automatic switching is about 8S, and the city and county should reliably hide the maximum time.
[0056] Step 4, check the section;
[0057] Step 5, obtain the power supply scheme; the power supply scheme is based on priority for load transfer, and is determined according to the changing section, considering the load supply capacity of the opposite side line and the load supply situation of the main transformer;
[0058] Step 6: Execution mode, ...
Embodiment 2
[0065] like figure 1 In the shown method for recovering power supply of urban power grid based on 10kV special feeder backup and self-switching, in Step 2, on the basis of Embodiment 1, the criterion is: when a 10kV single or multiple busbars lose voltage is detected , the line voltage and phase voltage are both lower than the set value, which is 30% of the rated voltage; and the relevant main transformer main circuit and segment switch current, active power are all lower than the set value, the current is 6A, and the active power is 0.1MW.
[0066] The following situations lead to long-term voltage loss of 10kV bus:
[0067] 1) The system side trips, the station has no backup automatic switch (single power supply), the backup switch is withdrawn (as a transfer station), or the backup switch action is unsuccessful.
[0068] 2) If the main transformer in the station fails, the switches on each side are tripped, and the backup automatic switching of the 10kV bus is not put into...
Embodiment 3
[0075] like figure 1 In the shown method for recovering power supply of urban power grid based on 10kV special feeder backup and self-switching, in step 2, on the basis of embodiment 1, in step 4, the verification section needs to first carry out the corresponding plan stored in the system Verification, the content of verification mainly includes the following points:
[0076] 1) Check the correctness of the running mode
[0077] Since the current operation mode may be different from the operation mode of the plan storage, resulting in the failure of the plan execution, it is necessary to continue to compare the operation mode of the plan and the current operation mode, and the ones that are completely consistent will pass the mode verification;
[0078] 2) Correctness verification of power supply capability
[0079] The verification of power supply capacity is mainly to verify the power supply capacity of the power supply, so as to avoid the risk of secondary tripping due t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com