The invention discloses a power distribution network post-fault load
recovery method considering minimum duration, which comprises the following steps of: 1, establishing a target function of a power distribution network post-fault load
recovery model by taking maximization of weighted load
recovery quantity and maximization of minimum duration of a micro-grid as targets; 2, establishing a power distribution network radial constraint by considering the running radial performance of the power distribution network; 3, considering the minimum duration of the micro-grid, and establishing the minimum duration constraint of the micro-grid; 4, mobile emergency power supply vehicle constraints are established; 5, considering
operation safety of the power distribution network, and establishing
power flow balance and
safe operation constraints of the power distribution network; and 6, solving the power distribution network post-fault load recovery model, and obtaining a power distribution network post-fault load recovery scheme. According to the method, the
operation safety of the power distribution network is ensured, the problem of unbalanced
power flow is avoided, the minimum
duration time of the micro-grid and the mobile emergency power supply vehicle are cooperatively considered, the load
recovery method after the power distribution network breaks down is effectively obtained, and the power failure loss is reduced.