A Comprehensive Algorithm for Determining Reasonable Construction Cable Forces of Cable-Stayed Bridges
A cable-stayed and cable-stayed bridge technology, applied in cable-stayed bridges, bridges, bridge parts, etc., can solve the problems of immature use, deviation of results and design values, state and calculation are not closed, saving time, reducing effect of times
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The technical solution of the present invention will be further described below in conjunction with the accompanying drawings, but it is not limited thereto. Any modification or equivalent replacement of the technical solution of the present invention without departing from the spirit and scope of the technical solution of the present invention should be covered by the present invention. within the scope of protection.
[0017] The comprehensive algorithm for determining the reasonable construction cable force of a cable-stayed bridge provided by the present invention includes the following steps: firstly calculate the minimum limit value of the initial tension of the cable-stayed cable, obtain the completed bridge state through the preliminary calculation of the cable force value, and extract the effect of the cable force Matrix, through the influence matrix, adjust the tension value, so that the cable force value in the completed bridge state is consistent with the des...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


