Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology

A panoramic technology, three-dimensional technology, applied in the field of project progress supervision using three-dimensional panoramic technology combined with BIM technology, can solve problems such as progress delays, rework, manpower, vertical capacity, and complexity of construction conditions, and achieve improved sensory cognition, improved The effect of schedule management and quality management

Inactive Publication Date: 2016-06-29
SHANGHAI JIETU TIANXIA NETWORK SCI & TECH
View PDF7 Cites 58 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to problems such as manpower, vertical transport capacity, and the complexity of construction conditions, the project supervisor and the owner may not be able to understand the real situation between the construction site and the design model well.
On the other hand, most engineering projects have a medium-to-long-term construction period. Based on the consideration of income and cost, the project unit hopes that the project quality and progress control should be as accurate as possible. Often, a link in the on-site construction process does not match the design stage. delays and rework

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
  • Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
  • Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] Below in conjunction with the drawings, preferred embodiments of the present invention are given and described in detail.

[0032] A method of project progress supervision using three-dimensional panorama technology combined with BIM technology of the present invention comprises the following steps:

[0033] Step S1, for the engineering project, import or make a model for the area that needs to be understood and supervised by the engineering project, and construct a corresponding BIM model;

[0034] Step S2, collecting 3D panoramic data on the construction site of the corresponding engineering project for the area that needs to be understood and supervised by the engineering project, and generating 3D panoramic data of the engineering site;

[0035] Step S3, associating and integrating the BIM model in step S1 with the 3D panoramic image of the engineering site in step S2;

[0036] In step S4, the integrated 3D panorama of the engineering site and the BIM model data ar...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology. The method comprise following steps of S1: constructing a BIM model for an engineering project; S2: carrying out three-dimensional data acquisition on a construction field of the engineering project and making a three-dimensional panoramic image of the engineering field; S3: associating and integrating the BIM model in the S1 and the three-dimensional panoramic image of the engineering field in the S2: and S4: carrying out synchronous comparison according to positions and carrying out switching comparison according to different time schedules on the associated and integrated data of the three-dimensional panoramic image and the BIM model. According to the invention, sense organ recognition between actual construction conditions and designing models is effectively improved; effective reference basis is provided for construction schedule conditions and onsite construction conditions; and schedule management and quality management of the whole designing and construction stage are effectively improved.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to a method for supervising project progress by using three-dimensional panorama technology combined with BIM technology. Background technique [0002] With the development of the domestic architectural design field, BIM has been initially applied to the construction industry and demonstrated its huge commercial value, but there are still great limitations in the current application status of BIM. Share and transfer during the life cycle of project planning, operation and maintenance, so that engineering and technical personnel can make correct understanding and efficient response to various building information, and provide design teams and construction entities including construction operators The foundation of collaborative work plays an important role in improving productivity, saving costs and reducing construction time. However, in terms of project progress a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/08G06F17/50G06T17/00
CPCG06F30/20G06Q50/08G06T17/00
Inventor 马姚康刘小华
Owner SHANGHAI JIETU TIANXIA NETWORK SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products