Blocking Method of Deep Buried Large Diameter Disused Sewage Pipeline

A sewage pipeline and large-diameter technology, which is applied in the sewer pipeline system, waterway system, water supply device, etc., can solve the problems of high cost, high risk of going into the well, and many preparations, so as to reduce the amount of use and reduce the number of people going into the well. Risk and the effect of saving construction costs

Active Publication Date: 2018-08-03
中铁七局集团第五工程有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the deep sewage pipeline, the underground environment is harsh, and the air is not smooth, there may be CH 4 , CO and other toxic gases, although it is required to "drain the water and change the gas" before going into the well, and take preventive measures against the possible incoming water from the upstream of the sewage pipeline and the return water from the downstream to impact the underground operators as required, and adopt effective vulcanization The absolute value of hydrogen sulfide at the working point and adjacent points measured by the hydrogen tester is less than 10 micrograms, and the original ventilation measures must be kept unchanged before going into the well. Experienced professional team, the cost is relatively high, and the risk of personnel going into the well is still high under various sufficient preparation conditions

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] The plugging method of the present invention will be described in more detail below through specific examples.

[0013] For example, during the construction of the Zijingshan Road Station of Zhengzhou Metro Line 5, a reinforced concrete sewage pipe was buried under the original road section. The sewage pipe was buried with a depth of about 7.7 meters, a pipe diameter of 1,200 mm, and a wall thickness of 15 cm. The protective piles conflicted, so the sewage pipe was relocated. After the pipeline relocation was completed, the original sewage pipeline was abolished, and the abandoned sewage pipeline caused a large amount of mud loss during the construction of the bored pile, which prevented the concrete from being poured to the design elevation, and the abandoned sewage pipeline needed to be blocked.

[0014] This plugging construction is performed according to the plugging method of the present invention.

[0015] Mechanical preparation: YTR280C rotary drilling rig is equipped ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a plugging method of a deep-buried large-diameter waste water pipeline.Firstly, a plugging position is determined, a drill bit with the diameter larger than the outer diameter of a sewage pipeline by 25-50 mm is selected for vertical drilling, and the drill bit penetrates through the bottom of the sewage pipeline by 500 mm; backfilling is performed with plain soil through a loader, tamping is performed in layers, and backfilling is performed with the plain soil till backfilling height is larger than the top of the pipeline by 500 mm; a drill bit with the diameter equal to the outer diameter of the sewage pipeline is selected for drilling in backfill soil till drilling depth is 500 mm away from the bottom of the sewage pipeline; a guiding pipe is lowered, concrete is adopted for pouring plugging till a concrete face is higher than the top face of the sewage pipeline by 500 mm, and construction is completed.According to the method, no staff needs to go down to a well for operation during plugging construction, the risk caused when staff goes down to a well for operation is reduced, plain soil and a concrete plug are adopted for plugging construction, tamped plain soil is utilized for surrounding and blocking poured concrete pulp, the using amount of plugging concrete is reduced, the poured concrete forms a pipe plug, brick building construction is not needed, and the construction cost is greatly saved.

Description

Technical field [0001] The invention relates to the treatment of waste sewage pipelines, in particular to a method for plugging deep buried waste pipelines with large diameters. Background technique [0002] Large sewage pipelines in cities are generally buried deep (about 8 meters underground) due to the characteristics of the transported medium. With the rapid development of today's cities, the development and utilization of subways and underground spaces often conflict with buried underground pipelines, and the original pipelines need to be relocated. Due to the large diameter of sewage pipes (all over one meter), if the abandoned pipes are not blocked, subsequent construction will be affected (for example, a large amount of mud will be lost during the construction of bored piles and concrete cannot be poured. To design elevation). In this regard, it is necessary to block the abandoned sewage pipes. The existing plugging method mainly relies on manual plugging from the insp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E03F3/00
CPCE03F3/00
Inventor 刘瑞刚赵红新任熠王晓普孙恒果郭伟周燕萍
Owner 中铁七局集团第五工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products