Device for avoiding buried pipeline sedimentation in room subsoil backfill region and construction method

A technology for buried pipelines and construction methods, which is used in pipeline laying and maintenance, pipes/pipe joints/fittings, machinery and equipment, etc., can solve the problem that the quality of backfilling of house core soil is difficult to control, the blockage or fracture is difficult to find, and the water supply and drainage pipes are blocked. and other problems, to achieve the effect of preventing pipeline blockage and fracture, ensuring safety and normal use, and ensuring construction quality.

Inactive Publication Date: 2016-08-03
TIANJIN 20 CONSTR
View PDF6 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) Since the water supply and drainage pipelines of the first floor are located in the backfill area of ​​the atrium core soil, and the quality of the atrium core soil backfill is extremely difficult to control, the backfill soil often settles, resulting in the buried water supply and drainage pipelines being blocked due to subsidence or fracture
[0004] (2) Since the water supply and drainage pipes are laid underground, it is often difficult to find the blockage or breakage in a short period of time. Once damaged, the user will not be able to use it
[0005] (3) If the water supply and drainage pipes that are clogged or broken are located indoors, their maintenance will be inconvenient. First, it will have a great impact on the lives of the residents. Second, due to the inconvenience of maintenance, the renovated floors of the residents will need to be demolished. resulting in large economic losses

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Device for avoiding buried pipeline sedimentation in room subsoil backfill region and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] In order to make the present invention easier to understand, the technical solutions of the present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

[0023] In order to achieve the technical purpose of the present invention, the present invention provides a device for avoiding the subsidence of the buried pipeline in the backfill area of ​​the atrium core, and uses the device to lay the water supply and drainage pipeline.

[0024] Referring to the accompanying drawings, the present invention is used to avoid the subsidence of buried pipelines in the atrium core soil backfill area, comprising a frame-shaped pipeline hanger 1 with an open upper end, the pipeline hanger 1 is placed in the atrium core backfill soil 5, Its upper end is fixed with the ground beam or with the anchor member 3 in the reinforced concrete floor 4, and its bottom is installed with an inverted U-shaped card 2 for fixing the pipeline 6.

[00...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a device for avoiding buried pipeline sedimentation in a room subsoil backfill region and a construction method. The device comprises a pipe hanger. The upper end of the pipe hanger is connected with anchoring components in a concrete ground beam or a reinforced concrete floor. The center of the bottom of the pipe hanger is connected with a U-shaped clamp. The construction method includes the steps of arranging the pipe hanger in a pipeline trench, arranging a pipeline at the bottom of the pipe hanger and fixing the pipeline through the U-shaped clamp, performing a hydraulic test or a closed water test, performing trench backfill, performing floor construction and the like. The device and the construction method have the beneficial effects that defects existing in the prior art are overcome, the stress carrier of the pipeline is changed fundamentally, the problems of pipeline blocking and breakage and the like caused by foundation settlement are eliminated completely, and the safety and normal use of the pipeline are guaranteed, so that construction quality is guaranteed, the economic loss is reduced, and good practicability is achieved.

Description

technical field [0001] The invention relates to the construction of a civil building water supply and drainage pipeline, more specifically, the invention relates to a device and a construction method for avoiding the settlement of the water supply and drainage pipeline in the backfilling area of ​​the civil building core. Background technique [0002] At present, in many residential projects using raft foundations, the water supply and drainage pipes are buried on the first floor. This laying method has the following disadvantages: [0003] (1) Since the water supply and drainage pipelines of the first floor are located in the backfill area of ​​the atrium core soil, and the quality of the atrium core soil backfill is extremely difficult to control, the backfill soil often settles, resulting in the buried water supply and drainage pipelines being blocked due to subsidence or fracture. [0004] (2) Since the water supply and drainage pipes are laid underground, it is often d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): F16L1/028
CPCF16L1/028
Inventor 杜君为程建凯马全丽王先飞刘竹周爽王斌吴泽王敬泽张旭杰裴龙飞孙勤博肖世亮杨鹏陈许钢冯浩轩田冶时东健杨德绵梁树东于宝凯李宁刘海亮李冠达朱小刚
Owner TIANJIN 20 CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products