Method for producing high-strength steel grit by adopting waste tire steel wires
A waste tire and steel wire technology, applied in the field of metal abrasive production, can solve the problems of damage to workers' health, high manufacturing cost of steel wire cutting, and high consumption of fragility, so as to achieve wide application range, simple and efficient production process, and low manufacturing cost Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] A method for producing high-strength steel sand by using waste tire steel wire, comprising the following steps:
[0013] (1) Heat treatment: Bundle the waste tire steel wires into small bundles of 15-20kg, then put the steel wire bundles into a straight-type heating furnace, heat them to 600°C, and then immerse them in water to cool them so that they are completely quenched and hardened. Reach above 64HRC; then perform tempering treatment, the tempering conditions are: heating to 200°C, constant temperature for 20 minutes, heat preservation for 24 hours, and cooling with water;
[0014] (2) Screening: crush the steel wire with an air hammer to obtain semi-finished steel sand, use a vibrating screen to screen the semi-finished steel sand into various diameters, and use a circular separator to divide the semi-finished steel sand into various shapes to obtain finished steel sand.
Embodiment 2
[0016] A method for producing high-strength steel sand by using waste tire steel wire, comprising the following steps:
[0017] (1) Heat treatment: Bundle the waste tire steel wires into small bundles of 15-20kg, then put the steel wire bundles into a straight-tube heating furnace, heat them to 800°C and quickly immerse them in water to cool them down, making them in a state of complete quenching and making them hard Reach above 64HRC; then perform tempering treatment, the tempering conditions are: heating to 400 ° C, constant temperature for 15 minutes, holding temperature for 6 hours, cooling with water;
[0018] (2) Screening: crush the steel wire with an air hammer to obtain semi-finished steel sand, use a vibrating screen to screen the semi-finished steel sand into various diameters, and use a circular separator to divide the semi-finished steel sand into various shapes to obtain finished steel sand.
Embodiment 3
[0020] A method for producing high-strength steel sand by using waste tire steel wire, comprising the following steps:
[0021] (1) Heat treatment: Bundle the waste tire steel wires into small bundles of 15-20kg, then put the steel wire bundles into a straight-type heating furnace, heat them to 700°C, and then immerse them in water to cool them so that they are completely quenched and hardened. Reach above 64HRC; then perform tempering treatment, the tempering conditions are: heating to 300 ° C, constant temperature for 20 minutes, heat preservation for 18 hours, and cooling with water;
[0022] (2) Screening: crush the steel wire with an air hammer to obtain semi-finished steel sand, use a vibrating screen to screen the semi-finished steel sand into various diameters, and use a circular separator to divide the semi-finished steel sand into various shapes to obtain finished steel sand.