A High Ductility Assembly Integral Frame Edge Node Connection Structure and Construction Method

A connection structure and node connection technology, which is applied in the direction of building structure, construction, climate change adaptation, etc., can solve the problems of high price and uneconomical, and achieve the effect of convenient construction, favorable construction and increased construction speed

Active Publication Date: 2019-05-21
SOUTHEAST UNIV
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

And because the price of ECC is relatively high, it is obviously uneconomical and unnecessary to replace concrete with ECC materials in building structures

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A High Ductility Assembly Integral Frame Edge Node Connection Structure and Construction Method
  • A High Ductility Assembly Integral Frame Edge Node Connection Structure and Construction Method
  • A High Ductility Assembly Integral Frame Edge Node Connection Structure and Construction Method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0070] The column-to-column connection is connected by grouting sleeve 4 grouting connection method. Go through the reserved tunnel 5 and install reinforcing steel bars 9 at the joints of the beam-column side joints and anchor them with grout. Thread the end of the anchoring steel bar, and use the holed backing plate 10 and nut 11 for anchoring. At the end of the composite beam, use fiber cement-based composite material 3 for engineering to realize the beam-column connection. The length of the connection area is 400mm ~500mm, the exterior of the backing plate 10 is also sealed with the fiber cement-based composite material 3 for engineering.

[0071] The present invention is a high-ductility assembled integral frame side node connection structure and the component preparation process and application process of the construction method are as follows:

[0072] 1. Determine the dimensions, reinforcement, etc. of the prefabricated column 1 and prefabricated beam 2 components of t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high-ductility assembled integral type frame exterior joint connection structure and a construction method thereof. Members adopted comprise a precast column and precast beams. In the assembled -type concrete frame structure, column-column connection joints are connected in the grouting manner by utilizing grout sleeves at each layer of point of inflection or points of inflection of every two layers. Connection of exterior beam-column joints is achieved in the manner of anchor grouting and bolt anchoring in joint reserved pore channels. Tensile bars at the upper part and L-shaped ribs at the lower part penetrate through the reserved pore channels and subjected to anchor grouting. End parts of anchor bars on the other side are subjected to mantle fibers and anchored. The composite beam ends and the outside of a base plate are subjected to connection and sealing of beams and columns by adoption of fiber cement composite material used for engineering.The high-ductility assembled integral type frame exterior joint connection structure and the construction method thereof have following beneficial effects: the aseismic design concept of strong columns and weak beams, strong shear capacity and weak bending capacity, and strong joints and weak members is achieved; aseismic performance of the assembled concrete framework structure is improved; and vertical members are connected by grout sleeves so that constructaion is carried out conveniently and rapidly; and the construction progress is quickened.

Description

technical field [0001] The invention belongs to the field of structural engineering, and relates to a high ductility assembled integral frame side node connection structure and a construction method, which are mainly used in the assembled integral frame structure. Background technique [0002] China's construction industry is a traditional industry with a long history. The construction industry has not only made an increasingly prominent contribution to the national economy, but also played a huge role in promoting employment, industrial linkage and other aspects. [0003] However, with the development of society, more and more contradictions in the construction industry have been highlighted: the energy consumption of the construction industry is too high, the phenomenon of dirty and messy construction sites is very common, the quality of construction is difficult to guarantee, and labor costs are rising, etc. All these phenomena show that the traditional construction indus...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B1/19E04B1/21
CPCE04B1/1903E04B1/21Y02A30/30
Inventor 潘金龙苏浩单奇峰
Owner SOUTHEAST UNIV