BIM construction management platform-based tunnel equipment management and expense calculation method

A technology for construction management and equipment management, applied in computing, data processing applications, instruments, etc., can solve problems such as inadequate management of tunnel equipment and chaotic cost calculations, and achieve the effects of promoting refined management, improving management levels, and fast calculations

Inactive Publication Date: 2016-09-28
CHINA RAILWAY TUNNEL GROUP CO LTD +1
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to overcome the deficiencies of inadequate management of existing tunnel equipment and chaotic cost calculation, the present invention discloses a tunnel equipment management and cost calculation method based on a BIM construction management platform

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM construction management platform-based tunnel equipment management and expense calculation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The present invention can be explained in detail through the following examples, and the purpose of disclosing the present invention is to protect all technical improvements within the scope of the present invention.

[0020] combined with figure 1 The described method for tunnel equipment management and cost calculation based on BIM construction management platform comprises the following steps:

[0021] The first step is to collect relevant information about the equipment used in the tunnel, and sort out the categories and items of tunnel equipment expenses;

[0022] The second step is to carry out customized development on the BIM construction management platform according to the combing results;

[0023] The third step is to enter the relevant information of the tunnel equipment in the BIM construction management platform, and output the corresponding equipment report according to the demand;

[0024] Step 4: According to the sorted out equipment stand-alone use f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a BIM construction management platform-based tunnel equipment management and expense calculation method. The method includes the following steps that: the relevant information of tunnel equipment is collected, the expense categories and expense items of the equipment are settled, customized development is carried out on a BIM construction management platform; the relevant information of the tunnel equipment is inputted, screening is carried out according to the sources of the equipment, and a corresponding equipment report is outputted; expenses generated by each kind of equipment at the current month are inputted according to the expense items of different tunnel equipment, and the stand-alone use expense reports of corresponding equipment are outputted; and based on stand-alone use expenses, the total use expenses of all the equipment of a project are calculated, and total equipment use expense reports of corresponding equipment are outputted. With the method of the invention adopted, when the information of the tunnel equipment is updated or changed, equipment information in the BIM construction management platform will be updated simultaneously through manual intervention, and a scientific and reasonable decision-making basis can be provided for the management of the tunnel equipment of the project. The method of the invention has the advantages of high speed and high accuracy.

Description

technical field [0001] The invention relates to the technical field of BIM technology information construction, in particular to a method for tunnel equipment management and cost calculation based on a BIM construction management platform. Background technique [0002] As my country's infrastructure construction is further strengthened, its technical complexity is getting higher and higher, and it is accompanied by a high degree of mechanization. Therefore, many large-scale equipment need to be put into construction. However, at present, most construction units still adopt the traditional extensive management mode for equipment management. Each project often pays more attention to "use" than "management" of large-scale equipment used, the management of equipment entry and exit is chaotic, and the classification of equipment usage fees is unclear. This leads to confusion in equipment management and high maintenance costs. [0003] Currently, for the calculation of tunnel equ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/0639G06Q10/0631G06Q50/08
Inventor 路耀邦王光辉卓越李治国彭方勇刘东亮周吉刚高军伟张迅
Owner CHINA RAILWAY TUNNEL GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products