[0012] The present invention will be further described below in conjunction with examples:
[0013] A 2CrMo heat treatment process, including the following steps:
[0014] 1) Temperature: 890±10°C
[0015] 2) Time: In general, the holding time is 90±10 minutes. The holding time of complex shaft parts depends on the effective thickness. The furnace loading factor is 1.5, and the tempering holding time is 1-1.5 times longer than the quenching holding time;
[0016] 3), medium: oil;
[0017] 4) Furnace loading method: multi-layer furnace for pin and ferrule parts, single-layer furnace for shaft parts (diameter greater than 80mm);
[0018] 5) Tempering temperature and cooling method: Tempering temperature is generally 610~630°C, after tempering, it is air cooled.