Method for calculating paving interval of geogrids for treating bump at bridge-head through abutment back reinforcement

A technology of geogrid and bridge head jumping, which is applied in the direction of calculation, electrical digital data processing, special data processing applications, etc., can solve the problem of easy settlement in the transition section, and achieve a good effect of uneven settlement

Active Publication Date: 2016-11-09
WUHAN UNIV OF TECH +1
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem to be solved by the present invention is to provide a geogrid paving interval that calculates and uses geogrid to reduce the subsidence of the abutment back reinforcement to control the bridge head jumping disease in view of the defect that the transition section of the highway bridge in the prior art is prone to settlement calculation method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for calculating paving interval of geogrids for treating bump at bridge-head through abutment back reinforcement
  • Method for calculating paving interval of geogrids for treating bump at bridge-head through abutment back reinforcement
  • Method for calculating paving interval of geogrids for treating bump at bridge-head through abutment back reinforcement

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0032] Such as figure 1 As shown, the calculation method of the geogrid paving interval of the platform back reinforcement of the embodiment of the present invention to control the bridgehead car jumping disease, may further comprise the steps:

[0033] S1. Obtain the geological exploration data of the foundation where the reinforced abutment is located, and calculate the consolidation settlement of the foundation in combination with the actual treatment method of the foundation, the type of subgrade filling and the design test data, and then perform the prediction and calculation of the post-const...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for calculating the paving interval of geogrids for treating bump at bridge-head through abutment back reinforcement. The method comprises the steps of S1, acquiring geological prospecting data of a foundation where a reinforced abutment is located, calculating consolidation settlement of the foundation according to actual foundation treatment mode, roadbed filling type and design test data, and then conducting anticipatory computing of post-construction settlement of the foundation; S2, deducing a geogrid stress solving equation according to the elastic membrane theory, and calculating the paving interval of the geogrids in the anchoring treatment mode and reverse packaging treatment mode according to the practical treatment condition of the geogrids. According to the method, the interval of the geogrids under anchoring and reverse packaging conditions is calculated by means of a model which better accords with the practical stress condition of the geogrids. By using the interval calculation method for guiding design and construction of the geogrids, differential settlement of a transition section of a bridge can be well treated.

Description

technical field [0001] The invention relates to the field of road engineering, in particular to a method for calculating the paving interval of a geogrid used to reinforce the back of the abutment to control the vehicle jumping disease at the bridge head. Background technique [0002] In recent years, my country's expressways have developed rapidly. According to the "Statistical Bulletin on the Development of the Transportation Industry in 2014": by the end of 2014, the total mileage of national highways reached 4.4639 million kilometers, and there were 757,100 highway bridges, that is, there is a highway bridge every 5.89 kilometers. , highway bridges occupy a very important position in the composition of highways in our country. Bridge head jumping caused by uneven settlement of road-bridge transition section is a common problem in expressway operation. When the settlement between them is inconsistent, uneven settlement will occur. This uneven settlement will cause "steps"...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F19/00
CPCG16Z99/00
Inventor 罗蓉黄婷婷李磊金露冯光乐王怀才王丽静
Owner WUHAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products