A technology of upside-down shaft wall and construction method, which is applied in the direction of sinking, earthwork drilling, shaft equipment, etc., can solve the problems of high cost of demolition and modification, high construction risk, and large construction site, so as to reduce the cost of demolition and modification and solve the problem of laying waste Difficulty releasing and reducing disturbance effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
[0030] Such as Figure 1-4 As shown, a construction method for hanging the shaft wall upside down in the open cut section of the entrance and exit described in the embodiment of the present invention includes the following steps:
[0031] S1 First excavate the vertical shaft on the side adjacent to the underground excavation, complete the lining structure after the vertical shaft reaches the bottom, reserve the two construction joints and then pour the stubble;
[0032] S2 Excavate the adjacent vertical...