Intelligent building system based on BIM and management thereof

A building and smart technology, applied in image data processing, data processing applications, 3D image processing, etc., can solve the problems of not being able to form an overall network, lack of interconnection of smart city systems, etc., to achieve automation of information management and realization of diverse functions to ensure accuracy and timeliness

Inactive Publication Date: 2016-12-07
JIANGSU SANLENG SMARTCITY&IOT SYST CO LTD
View PDF2 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The main purpose of the present invention is to provide a smart building system based on BIM in order to solve the problems of the lack of interconnection with the smart city system and the inability to form an overall network in the existing BIM-based smart building system and method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent building system based on BIM and management thereof
  • Intelligent building system based on BIM and management thereof
  • Intelligent building system based on BIM and management thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0057] In order to make the technical solutions of the present invention clearer and clearer to those skilled in the art, the present invention will be further described in detail below in conjunction with the examples and accompanying drawings, but the embodiments of the present invention are not limited thereto.

[0058] Such as figure 1 As shown, a BIM-based smart building system includes:

[0059] The data collection module 1 is used to obtain building and building surrounding environment data, wherein the building data includes building data and equipment data;

[0060] The data processing module 2 is used to process building data to obtain processed data;

[0061] The data storage module 3 is used to store the data processed by the data processing module 2;

[0062] The data output module 4 is used to output the data processed by the data processing module 2, and display the data processed by the data processing module 2 through the BIM model;

[0063] Cloud resource sc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an intelligent building system based on BIM and a management thereof, which belongs to the technical field of intelligent buildings. The system comprises a data acquisition module, a data processing module, a data storage module, a data output module, a cloud resource dispatching module, an intelligent city system module, a BIM application module and a BIM software learning module. The data processing module comprises a collision checking module, a collision calling module, a three-dimensional rendering module, a quick calculation module, a resource planning module, a multi-operation comparison module, a virtual construction module, a device operation and maintenance data integration module, an operation data output module, a BIM model data filtering module, a device parameter filtering module and a surrounding environment data filtering module. According to the invention, three-dimensional visualization display of a building is realized; all kinds of information of building operation and maintenance are highly integrated; information management automation is realized; and the cloud resource dispatching module retrieves intelligent city system data, BIM application data and BIM software learning data to realize function diversification.

Description

technical field [0001] The invention relates to a smart building system and a management method thereof, in particular to a BIM-based smart building system and a management method thereof, belonging to the technical field of smart buildings. Background technique [0002] BIM is the abbreviation of Building Information Modeling, which is usually translated as Building Information Modeling in China. Building Information Modeling (Building Information Modeling) is based on the relevant information data of construction projects as the basis for the establishment of building models. Information simulation simulates the real information of buildings. It has five characteristics: visualization, coordination, simulation, optimization and graphing. It includes all data in planning, design, construction, operation and other stages in the 3D model. Among them, when using the model, staff at any stage in the entire life cycle of the building can make effective and correct decisions base...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06T15/00G06T17/00
CPCG06Q10/0631G06Q10/0639G06T15/005G06T17/00
Inventor 岳建明岳东泽范英王联民董维赵国兵
Owner JIANGSU SANLENG SMARTCITY&IOT SYST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products