Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Calculation method for carrying out inverse estimation on Three Gorges Reservoir interval inflow process

A calculation method and reservoir technology, applied in calculation, special data processing applications, instruments, etc., can solve the problems of low calculation accuracy of the total amount of inflow, process and spatial distribution in the interval, and achieve the effect of accurate calculation and improved accuracy

Inactive Publication Date: 2017-02-08
CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION
View PDF2 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The technical problem mainly solved by the present invention is to provide a calculation method for inverting the inflow process of the Three Gorges Reservoir interval, which can solve the problem of low calculation accuracy of the total inflow, process and spatial distribution of the interval in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Calculation method for carrying out inverse estimation on Three Gorges Reservoir interval inflow process
  • Calculation method for carrying out inverse estimation on Three Gorges Reservoir interval inflow process
  • Calculation method for carrying out inverse estimation on Three Gorges Reservoir interval inflow process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0036] The concrete steps of embodiment one are as follows:

[0037] Step 1. Collect the daily average flow process data of the main stream of the Three Gorges Reservoir in 2009 after the construction of the Three Gorges Reservoir, Zhutuo Station, Jialing River Beibei Station, and Wulong Station, and the daily average flow process data of the outbound station Huanglingmiao Station in 2009. The process data of the measured water level in front of the dam, the section data of the main and tributary rivers in the reservoir area at the end of 2008 and the area data of the small tributaries in the reservoir area;

[0038] Step 2. Based on the collected data, establish a one-dimensional unsteady flow hydrodynamic model of the main and tributary channels of the Three Gorges Reservoir. The model is a tree-shaped river network model, and the basic equation of the model is the Saint-Venant equation. The point implicit difference scheme is used to discretize the basic equation of the mod...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a calculation method for carrying out inverse estimation on a Three Gorges Reservoir interval inflow process. The calculation method comprises the following steps of: S1: collecting data including an entrance and exit boundary water level discharge, main stream and tributary river sections in a reservoir interval and the drainage area of each small tributary in the reservoir interval; S2: establishing a one-dimensional unsteady flow hydrodynamic model of the main stream and tributary rivers of the Three Gorges Reservoir; S3: firstly, independently giving a fixed hypothetical value to each afflux small tributary daily average discharge of the reservoir interval, then, adopting an established hydrodynamic model to carry out reservoir interval water flow transportation calculation, and distributing a difference value between a daily outflow discharge process calculation value and a practical measurement value into each afflux small tributary of the reservoir interval so as to obtain the inflow process value of each small tributary of the interval; and S4: carrying out manual correction on parts of moment values, which are obtained by calculation, in the inflow process of each small tributary of the interval. By use of the calculation method for carrying out inverse estimation on the Three Gorges Reservoir interval inflow process, the problems of the total amount, the process and the space distribution of interval inflow can be simultaneously solved, calculation accuracy is high, and a technical support can be provided for reservoir scheduling.

Description

technical field [0001] The invention relates to the technical field of water conservancy engineering, in particular to a calculation method for inverting the inflow process of the Three Gorges reservoir interval. Background technique [0002] The reservoir area of ​​the Three Gorges Reservoir is more than 700km long, and there are many interval tributaries. Except for the Jialing River and the Wujiang River, there are still large interval flows. Based on the measured data of the main stream Zhutuo Station, the tributary Jialing River Beibei Station and the tributary Wulong Wulong Station of the main branch inflow control station of the Three Gorges Reservoir, the percentage of the interval flow of the Three Gorges Reservoir area to the outlet flow of the Yichang Station: 12.2 for the series in the 1960s %; 13.3% for the series in the 1990s; 9.1% of the export traffic at Huanglingmiao Station from 2003 to 2013. Interval flow tends to flow in concentratedly, and its impact ca...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F19/00
CPCG16Z99/00
Inventor 黄仁勇
Owner CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products