Pile-forming method for drilling cast-in-place pile
A technology of bored piles and piles, which is applied to sheet pile walls, buildings, and foundation structure engineering, etc. It can solve problems such as separation, deviation, and segregation of reinforcement cages, and achieve the effects of improving integrity and reducing separation and deviation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0013] 1: Drill the hole first, and then clean the hole after reaching the design elevation.
[0014] 2: Lower the hollow steel pipe with the side full of small holes.
[0015] 3: The outside and inside of the steel pipe are covered with graded gravel, and at the same time, the grouting pipe is lowered in the middle of the steel pipe until the gravel is covered with the entire pile.
[0016] 4: Start high-pressure injection of cement slurry, and the pile will be formed after the slurry is filled.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com


