A construction method and prestressing technology, applied in the direction of columns, pillars, pier columns, etc., can solve the problems of construction quality, extremely high construction period requirements, structural and pouring construction constraints, and differences in prestressed column groups, etc., to reduce the waiting time The effect of reducing time, shortening the construction period, and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] (1) Bind the steel bars of the first batch of prestressed columns in the running water batch according to the requirements of the construction drawing.
[0025] (2) According to the construction drawings and flow batches, select the corresponding shaped steel mold. The shaped steel mold can be disassembled and supported immediately, which can shorten the turnaround time of flow water and ensure the appearance quality of pouring at the same time.
[0026] (3) In order to prevent the concrete from leaking, seal the joints of the steel mold and the openings of the studs with glass glue.
[0027] (4) Aiming at problems such as dense structural reinforcement, mutual restriction between bellows and concrete pouring, etc. that affect the quality of final concrete pouring, self-compacting concrete is used instead of ordinary concrete for pouring. The self-compacting concrete selected has early-strength properties, and the strength will be strong after 10 days after pouring It r...