Business information transmission method and device
A technology of business information and transmission method, which is applied in the field of business information transmission method and device, can solve problems such as waste of power business traffic, and achieve the effects of optimizing power business information transmission network, high applicability, and saving traffic and bandwidth
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] This embodiment provides a business information transmission method, such as figure 1 shown, including the following steps:
[0046] S1: Determine whether the start time of the first service is within the start time period of the second service, wherein the second service is a time-discontinuous service, and the start time period of the second service includes service duration and multiple idle periods Time, the start time of the first business is within the start time period of the second business means that the start time of the first business is not earlier than the start time of the second business, and at the same time, the end time of the first business is not later than the start time of the second business 2. The end time of the business.
[0047] S2: If the start time of the first service is within the start time of the second service, then judge whether the sum of the total duration of the second service and the total duration of the first service is not grea...
Embodiment 2
[0096] This embodiment provides a service information transmission device, the structural block diagram is as follows image 3 shown, including:
[0097] The first judging unit 01 judges whether the start time of the first service is within the start time period of the second service, wherein the second service is a time-discontinuous service, and the start time period of the second service includes service continuation time and free time;
[0098] The second judging unit 02, if the starting time of the first business is within the starting time of the second business, then judge whether the sum of the total duration of the second business and the total duration of the first business is not greater than the second The start time period of the business;
[0099] The transmission unit 03, if the sum of the duration of the second service and the duration of the first service is not greater than the start time period of the first service, intersperses the first service with the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


