Seat seal and examining seal integrated technical method of horizontal well and orientating well
A process method and directional well technology, which are applied in the field of integrated process of setting and sealing, can solve the problems of delayed construction period and large drilling workload, and achieve the advantages of convenient operation, overcoming the delayed construction period, and simple and easy-to-operate sealing process. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] In order to overcome the problems of delaying the construction period and heavy tripping workload in the prior art, this embodiment provides an integrated process method for setting and checking seals of horizontal wells and directional wells, which includes the following steps:
[0021] Step 1) Connect the safety joint 5, centralizer 4, seal verification packer 3 and bridge plug 1 to the tubing 6 in sequence, and the bridge plug 1 is connected to the end of the horizontal section of the tubing 6 through the setting tool 2 to obtain the setting and Integrated process string for seal inspection, such as figure 1 As shown, the process string is lowered to the target section of the casing 7;
[0022] Step 2) Set the bridge plug 1 under the action of the setting tool 2 and throw it away, and then observe whether it is unobstructed from the positive circulation wellbore of the tubing 6;
[0023] Step 3) Lift up and lower the oil pipe 6 and set the seal seal packer 3. From t...
Embodiment 2
[0029] Such as figure 1 As shown, the working principle of the integrated process string for setting and checking seals of horizontal wells and directional wells adopted in the present invention is as follows:
[0030] The tubing 6 is sequentially connected with a bridge plug 1, a seal check packer 3, a centralizer 4 and a safety joint 5 from the end. The bridge plug 1 is connected to the end of the horizontal section of the tubing 6 through a setting tool 2, and the tubing 6 is lowered to At the target position, under the action of the setting tool 2, the bridge plug 1 is set and dropped, and the oil pipe 6 is lifted up and down to set the seal inspection packer 3. From the oil pipe 6, it is pressed 10-15MPa to observe whether the casing 7 returns fluid, Whether the oil pipe 6 can hold and stabilize the pressure continuously. If the casing 7 does not return liquid, the oil pipe 6 stabilizes the pressure for 10 minutes, and the pressure drop is less than 2MPa, it means that th...