A drilling platform and cantilever beam technology, which is applied in the design and operation of jack-up drilling platforms, can solve the problem of high requirements on the number and total volume of ballast water tanks, constraints on the main dimensions and overall layout of the platform, and long pre-ballast operation time. and other problems, to achieve the effect of spacious equipment space layout, improving operation efficiency, and reducing the time for filling and discharging
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0013] Such as figure 1 Shown, a kind of cantilever beam type self-elevating drilling platform pre-ballasting method, the method steps are as follows:
[0014] 1. Determine the distance that the cantilever beam 2 and the drill floor 3 need to move during the preloading operation of each pile leg: calculate the respective weights and center of gravity positions of the cantilever beam 2 and the drill floor 3, and calculate the planned distance on the platform The initial ground pressure that each leg can achieve when the ballast water tank is pre-ballasted, the initial ground pressure of each leg is compared with the target preload load that each leg needs to achieve, and the cantilever beam 2 and the drill The position of platform 3 is moved to realize that the actual ground pressure during the preloading operation of each pile leg is equal to the target preloading load to be achieved, and it is calculated that the cantilever beam 2 and the drill floor 3 are respectively the d...