Construction Method of Uncertain Set for Robust Scheduling of Power System
A technology of power system and construction method, which is applied in the direction of power network operating system integration, AC network voltage adjustment, information technology support system, etc., and can solve the problem of unresolved robust economy and robustness, conflict, control scheduling conservatism It is difficult to achieve the optimal solution and other problems to achieve the effect of improving the overall cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] In order to make the objects and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0044] Modeling
[0045] Considering the number of G thermal power units and W wind farms, the period is T; taking time t as an example, the output p of wind farm w under a certain confidence probability w,l and total output of wind power satisfy:
[0046]
[0047]
[0048] In the formula: p w,t and are the lower and upper bounds of the uncertainty set of wind farm w in period t, respectively; and are the lower limit and upper limit of the uncertainty set of total wind power output in period t, respectively;
[0049] 1) Objective function
[0050] Consider the variable operating cost of thermal power units as the objective fun...