Assembling type main variable foundation
A prefabricated and basic technology, applied in the field of main transformer foundation, can solve problems affecting foundation strength and durability, long construction period, and large size of main transformer foundation, so as to improve site construction efficiency and construction quality, improve construction efficiency, The effect of reducing project cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0018] Such as figure 1 An assembled main transformer foundation shown in this embodiment includes a bottom plate 1 integrally molded in the factory and a curved beam 2 integrally molded in the factory. The lower end of the curved beam is provided with a downward extending The first plug-in part 21 and the second plug-in part 22 are respectively provided with the first chute 11 and the second chute 12 for the insertion of the first plug-in part and the second plug-in part on the base plate, and the lower end of the curved beam The socket part of the curved beam can slide in the corresponding chute along the length direction of the chute, and each socket part of the curved beam is inserted into the chute of the bottom plate and after adjusting the position, it is poured into the cement material, which is usually Refers to concrete, the two are firmly connected. In order to make the curved beam stand directly on the chute of the bottom plate during assembly, the bottom of the b...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
