Three-step five-part excavating constructing method for small-section weak surrounding rock tunnel
A technology of weak surrounding rock and construction method, applied in tunnels, tunnel lining, earthwork drilling, etc., can solve the problems of slow construction progress, loose construction organization, long process time, etc., to ensure construction quality and safety, and speed up construction progress. , Optimize the effect of construction space
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0024] Embodiment: This embodiment is a construction method for tunnels with poor geological conditions such as weak geology and faults. Three steps and five parts (five parts) are used for excavation and support. Before excavation, high-density electrical methods and high-frequency electromagnetic sounding are used. Combined with advanced drilling method and advanced drilling, the combination of all-round and multi-parameters can obtain more accurate characteristic parameters of weak surrounding rocks and faults; combined with the results of advanced detection and evaluation analysis, the maximum pressure of advanced consolidation is selected, and the pressure P max = 0.01H+0.008h; where H: is the buried depth (m), h: is the height (m) from the water level line to the ground line. After the consolidation grouting is completed, the horizontal geological drill is used to pass through the consolidation grouting to implement the advanced drainage hole to realize the centralized di...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 