Box catchment and earthing planting system and method for utilizing system to conduct reclamation on open-air pit
A planting system and open pit technology, applied in the field of mine reclamation and water saving, can solve the problems of lack of soil resources, loss of land conditions for pits and ponds, and high cost of earthwork, so as to alleviate the problem of water shortage, improve the microclimate of farmland, and increase arable land. area effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as figure 1 , figure 2 As shown, the box water catchment and soil-covering planting system includes several interconnected boxes 5 located in the mine pit 4; the shape of the bottom of some box bodies 5 is equivalent to the shape of the position of the mine pit 4 where it is located, and the elevation of the bottom of some box bodies 5 Less than the elevation of the bottom of the open-pit body; several boxes 5 are provided with cover plates 2 at a certain distance from the top of the box body 5, and a number of water leakage holes 3 are arranged on the cover plate 2 at the position facing the box body 5; A geotextile 13 , a filter layer 14 and a soil-covering planting layer 15 are provided in sequence from bottom to top; among the several boxes 5 , the outermost box 5 is provided with a water inlet, and the outermost box 5 is close to the ditch 16 . The geotextile 13 can increase the dissolved oxygen content in the stored water, ensure the water quality, and prev...
Embodiment 2
[0049] Such as Figure 4 As shown, the box water catchment planting system of this embodiment is basically the same as that of Example 1. Several boxes are in the deep pit 21 of excavated soil and fired bricks, and some cover plates 2 are located on the top of some boxes 5, and some boxes In the body 5, the leftmost and the rightmost box body 5 close to the ditch 16 are all provided with water inlets, and the water inlets are connected to the ditch 16 outside the deep pit 21 of the excavated soil and fired bricks through the water inlet pipe 11, and the water inlets are provided with automatic The controlled valve 17 is provided with a second liquid level sensor 19 at the lower end of the water inlet, and a trash net 12 is provided at the connection between the water inlet pipe 11 and the ditch 16 .
[0050] The method for reclamation of the deep pit of excavating and burning bricks by using the above-mentioned box body water catchment and soil covering planting system is basi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com