High-efficiency construction equipment for concrete of architectural bridge pile foundation

A kind of construction equipment and concrete technology, which is applied in the field of high-efficiency construction equipment for building bridge pile foundation concrete, can solve the problems of high labor intensity, low work efficiency, and complicated operation, and achieve low labor intensity, ensure compactness, and high work efficiency Effect

Inactive Publication Date: 2017-12-15
王辉
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the above problems, the present invention provides a high-efficiency construction equipment for building bridge pile foundation concrete. Using the existing vibrating tools to vibrate and compact the concrete in the pile foundation pit, it is difficult to manually control the stability of the pouring tool during work, and in the process of concrete pouring, because the concrete is relatively heavy, manual control of the pouring tool is prone to accidental damage There is a threat to the safety of the staff. Manually using vibrating tools to vibrate and compact the concrete in the pile foundation pit is complicated. Pouring concrete and vibrating compaction cannot be carried out at the same time, and vibrating and compacting concrete with manually controlled vibrating tools cannot ensure the integrity of the concrete. Compactness, high labor intensity, complex operation and low work efficiency can realize the function of high-efficiency construction of pile foundation concrete, without manual control of pouring tools, no potential safety hazards, and no need for manual vibration compaction of concrete in pile foundation pits It can ensure the compactness of concrete, and the concrete pouring operation and vibration compaction operation can be carried out at the same time, and has the advantages of simple operation, low labor intensity, short time consumption and high work efficiency.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-efficiency construction equipment for concrete of architectural bridge pile foundation
  • High-efficiency construction equipment for concrete of architectural bridge pile foundation
  • High-efficiency construction equipment for concrete of architectural bridge pile foundation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.

[0020] Such as Figure 1 to Figure 4 As shown, a high-efficiency construction equipment for building bridge pile foundation concrete includes a base plate 1, a mounting hole is arranged in the middle of the base plate 1, a fixing device 2 is installed on the inner side of the upper end of the base plate 1, and the fixing device 2 is located in the mounting hole. A locking vibration device 3 is installed, and the locking vibration device 3 is located in the fixing device 2, and the fixing device 2 plays a fixed effect on the present invention, and the locking vibration device 3 has played a vibration effect on the concrete, and the fixing device 2 and the locking vibration The devices 3 are used in cooperation with each other to complete the proc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a high-efficiency construction equipment for building bridge pile foundation concrete, a base plate, a fixing device is installed on the inner side of the upper end of the base plate, and a locking vibration device is installed on the base plate. The present invention can solve the problems existing in the pile foundation construction process of existing construction projects that the existing pile foundation pouring tools need to be manually fixed, and the existing vibration tools need to be manually used to vibrate and compact the concrete in the pile foundation pit, which is difficult to do manually. Control the stability of the pouring tool during work, and because the concrete is relatively heavy during the concrete pouring process, manual control of the pouring tool is prone to accidents and poses a threat to the safety of the staff. Manually use vibration tools to vibrate and compact the concrete in the pile foundation pit The operation is complicated, pouring concrete and vibratory compaction cannot be carried out at the same time, and the vibratory compaction of concrete by manual control of vibrating tools cannot ensure the compactness of concrete, which can realize the function of high-efficiency construction of pile foundation concrete.

Description

technical field [0001] The invention relates to the technical field of bridge construction engineering equipment, in particular to a high-efficiency construction equipment for building bridge pile foundation concrete. Background technique [0002] The pile foundation is composed of a pile foundation and a cap connected to the pile top. If the pile body is completely buried in the soil and the bottom of the cap is in contact with the soil, it is called a low cap pile foundation; if the upper part of the pile body is exposed to the ground and the bottom of the cap is above the ground, it is called a high cap pile foundation. Construction pile foundations are usually low cap pile foundations. Widely used in bridge engineering, the construction of pile foundations requires drilling the construction site, then installing reinforcement molds bundled with steel bars or steel pipes into the existing installation holes, and finally pouring concrete into the reinforcement molds, but ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D15/04
CPCE02D15/04E02D2250/0023
Inventor 王辉
Owner 王辉
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products