Automatic prefabricated part splitting method based on BIM and computing device

A technology of prefabricated components and computing equipment, applied in computing, special data processing applications, instruments, etc., can solve problems such as error-prone, low efficiency, and large impact on drawing quality, and achieve the goal of improving work efficiency, accuracy and efficiency. Effect

Inactive Publication Date: 2018-01-05
CSCEC STRAIT CONSTR & DEV +1
View PDF4 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the existing technology, the design institute uses Revit software to design the building structure, and the drawing stage of the component drawings is manually split and drawn. The problems caused by the manual drawing of the drawings are low efficiency, error-prone, and the quality of the drawings is affected by the human factors of the designers. Greater impact

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Automatic prefabricated part splitting method based on BIM and computing device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] see figure 1 , a method for automatic splitting of prefabricated components based on BIM, which is suitable for execution in computing devices, uses the BIM plug-in application on the basis of Revit modeling, and completes the splitting of the BIM overall model through a series of click operations of the plug-in, including The following steps:

[0042] Design the BIM model, design the BIM overall model of the construction project. For example, design the overall model of the real estate project of XX Garden or the overall model of the commercial real estate project of XX Square or the overall model of the engineering project of XX Bridge.

[0043] Establish split parameters, built-in preset values ​​for prefabricated reference production process requirements, covering basic split rules such as prefabricated component code, prefabricated component category, prefabricated component output information content, and prefabricated component engineering quantity list. For ex...

Embodiment 2

[0056] A computing device for automatic splitting of prefabricated components based on BIM, including:

[0057] a processor adapted to implement the instructions; and

[0058] A storage device adapted to store a plurality of instructions adapted to be loaded and executed by a processor.

[0059] receiving instructions sent by the processor to design a BIM model, and designing the overall BIM model of the construction project.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an automatic prefabricated part splitting method based on BIM and a computing device. The method comprises the steps that an overall BIM of a building project is designed, splitting parameters are built, and splitting rules for the number, the classification, the output information content and the project amount of a prefabricated part are made according to the preset splitting parameters; the overall BIM is classified according to the splitting parameters, and a building type is determined, so that mistakes are prevented from being made in the subsequent splitting process; the overall BIM is split into refined models step by step through two-time splitting, and in the subsequent part verification process, only part of models need to be verified, and the overall model does not need to be verified, so that the work efficiency is improved; the overall BIM is decomposed into a set of various parts and split into the minimum units meeting the production manufacturingand transporting requirements, and the part shapes are subjected to restoration verification, so that splitting errors are avoided; a production drawing of the part shapes is directly output, and theaim of one-key splitting design of the prefabricated part is achieved with the combination of the splitting requirements of the prefabricated part. Therefore, the accuracy and the efficiency for designing the drawing of the prefabricated part based on the BIM are improved.

Description

technical field [0001] The invention relates to the field of architectural design, in particular to a method and computing equipment for automatic splitting of prefabricated components based solely on BIM. Background technique [0002] In modern architectural design, with the development of BIM technology and the continuous maturity of BIM software, prefabricated architectural design based on BIM technology has become the mainstream. Building Information Modeling (Building Information Modeling) or Building Information Management (Building Information Management) is based on the relevant information data of construction projects, establishes a three-dimensional building model, and simulates the real information of buildings through digital information simulation. . It has eight characteristics of information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and graphing. The construction unit, design unit, co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
Inventor 王耀王超郭立贵朱瑞添陈兵薛涛
Owner CSCEC STRAIT CONSTR & DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products