Coal pile sampler
A technology of sampler and coal pile, which is applied in the field of coal pile sampler, can solve the problems of inability to collect coal samples, high labor intensity, and time-consuming and labor-intensive operation methods, so as to reduce labor intensity and time spent, improve collection efficiency, and structure simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] Embodiment 1: A coal pile sampler, including a handle 1, a support rod 18, and a sampling tube 13 arranged horizontally from top to bottom, wherein the handle 1 is fixedly connected to the support rod 18, and the connection method can be welding or interference connection In the shaft sleeve connection mode, a sampling tube 13 is fixed below the support rod 18, and the sampling tube 13 is a shell on both sides that engages with each other, and is fixed by a clamp 12 to form a unified whole. The supporting rod 18 is sequentially provided with a driving wheel 2 and a driven wheel 5 with reduced wheel body diameters from top to bottom. The driving wheel 2 and the driven wheel 5 are connected by a first-level steel wire rope 4, and the first and last two ends of the first-level steel wire rope 4 are connected. The ends are fixed on the driving wheel 2 and the driven wheel 5 and are respectively wound on the outer surfaces of the two. On the articulated shaft 17 of the drive...
Embodiment 2
[0020] Embodiment 2: a coal pile sampler, wherein the ultrasonic transducer 14 includes a vibrator 23 that converts ultrasonic waves into mechanical energy, the vibrator 23 is a vibrator, and several vibrators are arranged on the lower outer surface of the vibrator 23 The fixed block 24, the fixed block 24 is used to fix the vibrating spring 22 and connect the vibrating spring 22 with the vibrating ring 20, the outer surface of the vibrating ring 20 is connected with the guiding block 19 through the guiding groove 21 and can be moved up and down along the guiding block 19 Movement, the guide block 19 is located on the inner surface of the sampling tube 13. The structures and connections of the remaining parts are the same as those described in any of the foregoing embodiments.
[0021] In view of the foregoing embodiments, when the application is in use, its working process and principle are as follows:
[0022] The purpose of the present invention is to provide a coal pile s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


