Construction method of pipe gallery by shielding before well arrangement
A construction method, the technology of corridor first shield, which is applied in the field of pipe jacking construction by pipe screen underground excavation method, can solve the problems that affect the construction progress and the construction of craft wells cannot be completed in advance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0044] refer to figure 1 , the present invention provides a construction method of the shield first and the well behind the shield pipe gallery. A plurality of process wells are arranged at intervals along the design route of the shield tunnel, and the process wells provide the pipe gallery with air supply, exhaust, power supply, and fire protection. And hoisting and other functions to ensure the construction safety of the shield pipe gallery. In the construction method provided by the invention, the shield tunneling machine passes through the craft well first, and then the craft well is constructed, that is, shield first and then well. It can solve the problem of affecting the construction progress caused by the untimely construction of the craft well in the construction method of the well first and back up, can not affect the progress of the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com