Unlock instant, AI-driven research and patent intelligence for your innovation.

Installation and construction method of long-span steel structure

A construction method and technology for steel structures, which are applied in building construction, building material processing, construction, etc., can solve the problems of high-altitude work, potential safety hazards, and difficulty in construction, and achieve reliable work support and improve work efficiency. Efficacy and high construction efficiency

Active Publication Date: 2019-09-20
SHANXI WUJIAN GRP CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Steel structure installation is an important part of steel structure engineering construction. With the development of my country's steel structure and the continuous updating of architectural concepts, the structural forms are becoming more and more diverse and complex. The steel structure designer and the steel structure itself contain The combination of technical aesthetics components and mechanical laws realizes the unity of force and shape. The visual space form presented by the steel structure reflects architectural creativity and realizes the unity of shape and meaning. It brings new challenges to the construction unit, especially for large-span and complex structures. The installation of steel structure is difficult during construction, the construction period is long, and the amount of high-altitude operations is large, which poses potential safety hazards

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Installation and construction method of long-span steel structure
  • Installation and construction method of long-span steel structure
  • Installation and construction method of long-span steel structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] In order to enable those skilled in the art to better understand the present invention, the present invention will be further clearly and completely described below in conjunction with reference to the accompanying drawings and in conjunction with embodiments. It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other.

[0035] In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", " The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and Simplified descriptions, rather than indicating or implying that the device or element referred to must ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an installation and construction method of a large span steel structure. The installation and construction method comprises the steps that simplified units are mounted throughcombination of integral hoisting and hoisting in bulk, and the simplified units are assembled on the ground first; the simplified units and second main supporting steel beams are correspondingly hoisted, first main supporting steel beams in the simplified units are connected with reinforced concrete brackets first, and then the second main supporting steel beams are connected with four-head joints and the reinforced concrete brackets; any group of first secondary supporting steel beams and second secondary supporting steel beams is hoisted and installed, after completion, next group of firstsecondary supporting steel beams and second secondary supporting steel beams is hoisted and installed until five group of first secondary supporting steel beams and second secondary supporting steel beams are fully hoisted and installed; and a group of angular supporting steel beams, first oblique steel beams and second oblique beams is hoisted and installed, and after completion, next group of angular supporting steel beams, first oblique steel beams and second oblique beams is hoisted and installed until five groups of angular supporting steel beams, first oblique steel beams and second oblique beams are fully hoisted and installed. According to the installation and construction method of the large span steel structure, the construction progress can be speeded up, the operation efficiency is improved, and the hoisting machinery tonnage is reduced.

Description

technical field [0001] The invention relates to a building construction method, in particular to a large-span steel structure installation and construction method. Background technique [0002] Steel structure installation is an important part of steel structure engineering construction. With the development of my country's steel structure and the continuous updating of architectural concepts, the structural forms are becoming more and more diverse and complex. The steel structure designer and the steel structure itself contain The combination of technical aesthetics components and mechanical laws realizes the unity of force and shape. The visual space form presented by the steel structure reflects architectural creativity and realizes the unity of shape and meaning. It brings new challenges to the construction unit, especially for large-span and complex structures. The installation of steel structure is difficult during construction, the construction period is long, and the a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/14
Inventor 王宇清罗忠强贾引龙闫月勤成振晋
Owner SHANXI WUJIAN GRP CO LTD