Intelligent load drop alarm method for electric power scheduling monitoring system
An intelligent alarm and monitoring system technology, applied in data processing applications, instruments, calculations, etc., can solve the problems that the dispatching monitoring system cannot make accurate judgments and issue, and the user's power supply is interrupted, so as to shorten the user's power outage time, reduce power loss, The effect of improving the response speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0021] Embodiment: An intelligent alarm method for load sudden drop in a power dispatch monitoring system, comprising the following steps:
[0022] Step 1. Select a number of historical load data, make a difference between each historical load data and the load data of the previous sampling point of the historical load data, select the data with negative difference as the sample library of load sudden drop, and use the sample library Carry out probability distribution statistics; determine that the load sudden drop value within 90% of the probability distribution is a normal load fluctuation, and determine the load sudden drop value as the load sudden drop over-limit alarm limit;
[0023] Step 2. Comprehensively consider the accuracy, timeliness, and semaphore of load dump alarms, and formulate intelligent alarm strategies for different causes of load dumps. The principles are:
[0024] a. Exclude impact loads and small loads;
[0025] b. For the switch tripping and planned m...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


