Diversion and purification system for an artificial lake water body and construction method thereof
A purification system and artificial technology, applied in the field of ecological environment, can solve the problems of affecting the landscape effect, increasing economic investment, etc., to achieve the effect of enhancing the landscape effect, reducing the degree of water pollution, and purifying water quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] The invention provides a water diversion purification system of an artificial lake, such as Figure 1 ~ Figure 3As shown, a preferred embodiment of the present invention is shown therein. The diversion and purification system of the artificial lake water body of the present invention is divided into two parts, the water inlet area 2 and the purification confluence area, by the first gabion diversion dam 3 .
[0034] Specifically, the diversion purification system includes a first gabion diversion dam 3 arranged around the lake inlet 1 in the artificial lake water body, and the first gabion diversion dam 3 separates the artificial lake water body into water inlet Area 2 and the purification confluence area, aquatic plants are planted in the purification confluence area, and the first gabion diversion dam 3 includes a dam body 15 arranged on the bottom of the artificial lake water body and a backside of the dam body 15 The backwater slope 16 on the water surface, the slo...
Embodiment 2
[0046] The present invention also provides a construction method of a diversion purification system for an artificial lake water body, the construction method comprising the following steps:
[0047] A. Construct the first gabion diversion dam 3, wherein the gabion is made from the inside to the outside to complete the distribution of water purification filler, geotechnical bag, gabion net 15, and the gabion is stacked in layers to form the dam body 15, At the same time, gravel 14 is used to construct the backwater slope 16, and a permeable material layer 13 is laid on the slope surface of the backwater slope 16.
[0048] The area surrounded by the first gabion diversion dam 3 and the revetment into the lake is the water intake area, accounting for about 1 / 8 to 1 / 5 of the entire artificial lake. Gabions are stacked in layers, and each layer along the direction of water flow is gravel filler 10, zeolite and steel slag mixed filler 12, and backwater slope 16, and the number of s...
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com