Ultra-large type lower guard plate subsection mounting method
An installation method and super-large technology, which are applied in the field of segmented installation of super-large lower guards, can solve the problems of lack of super-large lower guards, the quality of the second-stage concrete installation, and the inability to guarantee the pouring progress, so as to shorten the construction period and prevent running bit, the effect of saving resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0025] A segmented installation method for an ultra-large lower guard plate, comprising the following steps:
[0026] Step 1: Build a plurality of support frames 1 arranged in the horizontal direction on the inner side of the lower guard plate 4, and the support frames 1 are arranged adjacent to the lower guard plate 4; Set the installation elevation of the lower ring plate between adjacent fixed guide vanes 5 on the fixed guide vanes 5 based on the upper flange surface; and set the limit device for the horizontal special-shaped plate and the arc transition section;
[0027] In order to improve the installation quality and construction progress, reduce the possible large misalignment of the first section 41 of the lower guard plate and the second section 42 of the lower guard plate due to concrete expansion at the 4th section of the lower guard...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


