A high-efficiency staged fracturing method for horizontal wells isolated without tools
A technology for staged fracturing and horizontal wells, applied in the field of petroleum fracturing, which can solve the problems of increasing operation cycle and construction cost, increasing the construction risk of post-workover operations, and sticking pipe, so as to improve the effectiveness and construction efficiency, advanced The advantages and advantages are obvious, and the effect of use is remarkable.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0031] In order to further explore the new staged fracturing technology for horizontal wells, which can reduce production costs and operational risks, and improve production efficiency and single well output. The present invention proposes a tool-free high-efficiency staged fracturing technology for horizontal wells, through precisely controlled sand-packing between stages, dynamic multi-stage shunting and temporary plugging between clusters, to achieve staged fracturing of horizontal wells, and to ensure that each stage in each stage The effectiveness of cluster fractures can be maintained, the full diameter of the wellbore can be maintained, problems such as drill sticking and drilling grinding after conventional horizontal well fracturing can be avoided, and the effectiveness and construction efficiency of staged fracturing stimulation can be improved.
[0032] A method for high-efficiency staged fracturing of horizontal wells without tools, the specific steps are:
[0033]...
Embodiment 2
[0040] Based on the above embodiments, in this embodiment, in the first step, the multi-cluster spray guns are provided with a plurality of nozzles.
[0041] When performing multi-cluster hydrojet perforation, there are multiple perforation clusters in each section, and a dynamic multi-stage split flow temporary plugging method is used between clusters during multi-cluster hydrojet perforation.
[0042] The dynamic multi-stage shunting temporary blocking method is to adopt the overall combined pressure of multi-clusters in the whole section, and the inter-cluster temporary plugging boost standard is greater than 5MPa; the design principle is that the number of temporary blocking times is n-1, where n is the number of clusters. The natural selective plugging near the wellbore is realized by adding temporary plugging materials.
[0043]The temporary plugging material is a degradable material, which is composed of degradable fibers and degradable temporary plugging particles; the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com