A method for dismantling large-section multi-channel temporary intermediate partitions
A large-section, temporary technology, applied in excavation, tunneling, earthwork drilling, etc., can solve the problems of high safety risk, low construction efficiency, affecting the secondary lining, etc., to expand the operating space, improve construction quality, and ensure stability. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The dismantling method of the present invention will be further described below in conjunction with specific embodiments.
[0033] The removal method of the present invention specifically comprises the following steps:
[0034] Before construction, according to the monitoring and measurement data feedback, when the deformation rate of the surrounding rock formation is less than 0.2mm / d, it is judged to be in a stable state, and the temporary support structure can be removed for construction;
[0035] Step 1. First, use a pneumatic pick to chisel off the shotcrete on the middle and next door in sections. The chisel height is 1.5m. Remove two I-steel frames every other I-steel frame. Use gas welding to cut and remove the I-steel frames. Section demolition length is 10m;
[0036] The marked height of the bottom of the I-steel frame removed in step 2 should be the same as the marked height of the top surface of the structural bottom plate or slightly lower than the top sur...